Loading...
HomeMy WebLinkAbout20260915APPLICATION.pdf ' 11. RECEIVED September 15, 2026 Avista Corp. IDAHO PUBLIC 1411 East Mission P.O. Box 3727 UTILITIES COMMISSION Spokane. Washington 99220-0500 Telephone 509-489-0500 AVU-E-26-12 Toll Free 800-727-9170 September 15, 2026 Commission Secretary Idaho Public Utilities Commission 11331 W. Chinden Blvd. Bldg. 8, Ste. 201-A Boise, Idaho 83714 RE: Case No. AVU-E-26- Dear Commission Secretary: Attached for filing with the Commission is Avista Corporation's, doing business as Avista Utilities' (Avista or the Company), filing in compliance with Order Nos. 32697 and 32802, to update the Company's load forecast,natural gas forecast, and contract information components of the incremental cost Integrated Resource Plan(IRP) avoided cost methodology. Please direct any questions regarding this filing to John Lyons at 509-495-8515 or john.lyons(&,avistacorp.com. Sincerely, Amanda Ghering Regulatory Affairs Manager Avista Utilities 509-495-7950 amanda. herin ,avistacorp.com Anni Glogovac Counsel Avista Corporation 1411 East Mission, MSC-17 Spokane, WA 99202 Phone: (509)495-7341 Facsimile: (509) 777-5468 Email: Anni.Glogovac@avistacorp.com Attorney for Avista Corporation BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF AVISTA CORPORATION'S) CASE NO. AVU-E-26-XX ANNUAL COMPLIANCE FILING TO UPDATE ) THE LOAD AND GAS FORECASTS IN THE ) INCREMENTAL COST INTEGRATED ) RESOURCE PLAN AVOIDED COST MODEL ) TO BE USED FOR AVOIDED COST ) CALCULATIONS ) AVISTA CORPORATION'S COMPLIANCE FILING I. INTRODUCTION Avista Corporation, doing business as Avista Utilities (hereinafter Avista or Company), at 1411 East Mission Avenue, Spokane, Washington, respectfully submits to the Idaho Public Utilities Commission (Commission) this filing, in compliance with Order Nos. 32697 and 32802 in Case No. GNR-E-I 1-03, to update the load forecast, natural gas forecast, and contract information components of the incremental cost Integrated Resource Plan (IRP) avoided cost methodology. Communications in reference to this filing should be addressed to: Anni Glogovac Shawn Bonfield Counsel Sr. Manager Regulatory Policy& Strategy Avista Corporation Avista Corporation P.O. Box 3727 P.O. Box 3727 1411 E. Mission Avenue, MSC-27 1411 E. Mission Avenue, MSC-27 Spokane, WA 99220-3727 Spokane, WA 99220-3727 Phone: (509)495-7341 Phone: (509) 495-2782 Anni.Glogovac@avistacorp.com Shawn.Bonfield@avistacorp.com II. BACKGROUND In its final Order No. 32697' dated December 18, 2012, the Commission determined that the inputs to the IRP avoided cost methodology,utilized for all proposed Public Utility Regulatory Policies Act of 1978 (PURPA) qualifying (QF) projects that exceed the published rate eligibility cap, will be updated every two years upon acknowledgment of the utility's IRP filing, with the exception of the load forecast, natural gas forecast, and QF contract changes, which are to be updated annually. The date for the annual update was changed from June to October of each year. Further, in Order No. 32697, the Commission directed that after the filing of a utility's IRP that a ' Order No. 32697 page 22. 2 Order No. 32802 page 3. 11Page case be initiated to determine the capacity deficiency period to be utilized in the Surrogate Avoided Resource (SAR) Methodology.3 III. LOAD FORECAST The Company's most recent peak and energy forecast was developed on August 27, 2026, and is being used in the development of the 2027 Electric IRP. This load forecast is lower than last year's filing due to the loss of a significant industrial customer. Table 1: Energy Load Forecast Year Energy (aMW) 2027 1,140 2028 1,152 2029 1,159 2030 1,164 2031 1,169 2032 1,177 2033 1,186 2034 1,200 2035 1,215 2036 1,236 2037 1,258 2038 1,287 2039 1,324 2040 1,371 2041 1,407 2042 1,447 2043 1,475 2044 1,498 2045 1,520 2046 1,539 3 Order No. 32697 page 23. 2 Page IV. NATURAL GAS PRICE FORECAST The Company's most recent natural gas Forward Price Curve was developed for the 2027 Electric and Natural Gas IRPs by using a blend of two national price forecasting consultant's most recent long-term forecasts,the U.S. Energy Information Administration's Annual Energy Outlook (AEO),and the 50th percentile of the forward market trading history between December 16,2024, and December 16, 2025. Please refer to Table 2 for the natural gas price forecast for Henry Hub and Stanfield. Table 2: Natural Gas Price Forecast Annual Average Price $/Dth 2027 IRP Year HenryHub Stanfield 2027 3.91 3.14 2028 3.77 2.97 2029 3.74 3.03 2030 3.81 3.05 2031 4.20 3.42 2032 5.09 4.08 2033 5.29 4.53 2034 5.61 4.82 2035 5.81 4.92 2036 6.01 4.93 2037 6.20 5.05 2038 6.39 5.03 2039 6.57 5.16 2040 6.83 5.08 2041 7.21 5.27 2042 7.50 5.43 2043 7.83 5.75 2044 8.16 6.07 2045 8.54 6.23 2046 8.94 6.42 V. CONTRACT ADDITIONS AND TERMINATIONS Since the 2025 filing, Avista has signed one new PPA and one PURPA contract. 3 Page • There are pending agreements from the 2025 All-Source RFP that are expected to be finalized in the next two months. • Details concerning the dates and sizes of signed contracts are included in the workpapers. • Avista will provide an update after the remaining contracts are finalized. VI. MODIFIED PROCEDURE Avista believes that a hearing is not necessary to consider the issues presented herein and respectfully requests that this Application be processed under Modified Procedure, i.e.,by written submissions rather than by hearing. RP 201 et seq. If the Commission determines that a technical hearing is necessary, the Company will be ready to prepare and present its testimony in such hearing. VIL REQUEST Avista respectfully submits this updated load forecast, natural gas forecast, and contract information in compliance with Order Nos. 32697, 32802 and 35274. The Company requests that the Commission issue an order accepting its updated load forecast, natural gas forecast, and contract information to be used in the IRP method with an effective date of January 1, 2027. DATED at Spokane, Washington, this 15tn day of September 2026. AVISTA CORPORATION /s/Anni Glo ovac Anni Glogovac, ISB #13010 4 1 P a g e