HomeMy WebLinkAboutI202605 NOPV Response EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707•(208)377-6000• FAX:377-6097
June 10,2026
Mr.Jeff Brooks,Programs Manager
Idaho Public Utility Commission
PO Box 83720
Boise,ID 83720-0074
Subject:Response to the Notice of Probable Violation dated April 27,2026(Report#I202605)
Dear Mr.Brooks,
This letter is intended to address one(1)notice of probable violation stemming from a sample damage prevention
and line marker audit conducted by the Idaho Public Utilities Commission(IPUC)on April 16,2026,of
Intermountain Gas Company's(IGC)Idaho Falls District pursuant of Chapter 601 Title,49,United States Code.
PROBABLE VIOLATION
1. 49 CFR S 192.605 Procedural Manual for Operations. Maintenance. and Emergencies
(a) General. Each operator shall prepare and follow for each pipeline,a manual of written procedures
for conducting operations and maintenance activities and for emergency response.For transmission
lines,the manual must also include procedures for handling abnormal operations.This manual must
be reviewed and updated by the operator at intervals not exceeding 15 months,but at least once each
calendar year.This manual must be prepared before operations of a pipeline system commence.
Appropriate parts of the manual must be kept at locations where operations and maintenance
activities are conducted.
49 CFR S 192-703 General
(a)No person may operate a segment of pipeline,unless it is maintained in accordance with this
subpart.
49 CFRS 192-707 i.ine markers for mains and transmission lines
c)Pipelines aboveground. Line markers must be placed and maintained along each section of a main
and transmission line that is located above ground in an area accessible to the public.
2. 49 CFR S 192.1007 What are the required elements of an integrity management elan?
(b)Identify threats. The operator must consider the following categories of threats to each gas
distribution pipeline: corrosion(including atmospheric corrosion),natural forces,excavation damage,
other outside force damage,material or welds,equipment failure,incorrect operations,and other issues
that could threaten the integrity of its pipeline.An operator must consider reasonably available
information to identify existing and potential threats.Sources of data may include incident and leak
history,corrosion control records(including atmospheric corrosion records),continuing surveillance
records,patrolling records,maintenance history,and excavation damage experience.
(c)Evaluate and rank risk.An operator must evaluate the risks associated with its distribution pipeline.
In this evaluation,the operator must determine the relative importance of each threat and estimate and
rank the risks posed to its pipeline.This evaluation must consider each applicable current and potential
threat,the likelihood of failure associated with each threat,and the potential consequences of such a
failure.An operator may subdivide its pipeline into regions with similar characteristics(e.g.,
contiguous areas within a distribution pipeline consisting of mains, services and other appurtenances;
areas with common materials or environmental factors),and for which similar actions likely would be
effective in reducing risk.
EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707•(208)377-6000•FAX:377-6097
OPS 705 Gas Pipeline Markers and Signs Installation and ins ecn tion
5.INSPECTION AND MAINTENANCE
5.1.Pipeline markers shall be inspected at least every five(5)years,not to exceed 63 months.
Pipeline markers shall be inspected and documented during leak surveys in accordance with
OPS 706—Leak Survey.
5.5.Pipeline markers and signs shall be inspected for damage and overgrowth that may obscure
their visibility.Damaged,worn out,or missing signs shall be marked as a deficiency
5.6. During the survey/inspection of signs and pipeline markers, the surveyor(s) shall ensure that
pipeline markers and signs have the following,written legibly on the sign or pipeline marker
(not applicable for Waterway Crossing or Deterrent Custom Signage):
5.6.1. "Caution," "Warning,"or"Danger"followed by"Gas Pipeline"or"Natural Gas
Pipeline"in letters at least one(1")inch high with one-fourth('/4")inch stroke.
5.6.2. The appropriate MDUG organization and emergency phone number:
5.7. The pipeline marker or sign shall have a background of sharply contrasting color so that the
information stated on the sign or marker is easily visible.
OPS 1000 Distribution Integrity Management
3.2.3. Excavation Damage
Excavation damage is damage to pipeline facilities caused by earth moving or other
equipment,tools,or vehicles,including damage done by operator's personnel,
contractor,or people not associated with the operator.All buried facilities in MDUG's
distribution system face the threat of being damaged by excavation activities.
Consideration is given to piping within protective casings,inside underground
structures such as basins or vaults which may be shielded or protected from
excavation damage.Excavation damage can also be due to previous unknown
damage on pipelines that were not repaired and result in corrosion.
5.1. Overview
This section describes the existing and proposed measures to address the threats and
associated risk to MDUG's distribution system as outlined in Sections 3.0: Threat Identification
and 4.0: Risk Evaluation and Ranking.
Risk management is accomplished by taking actions to reduce the likelihood of an occurrence,
by alleviating the consequences of an occurrence or both.Appropriate actions are dependent
on the group being addressed,the associated threat,whether the threat is current or potential
in the future,and the viability of the actions in managing the relevant risk factors.
5.2. Existing Programs Addressing Risk Management
This section summarizes existing plans and programs implemented by MDUG that are
currently in place to manage risks.Each established program contributes to the management
and mitigation of risk to the distribution system.Details for each program are contained in
MDUG O&M procedures and are available upon request.
5.2.1.Damage Prevention
The prevention of damage to natural gas distribution facilities by excavation is one of
the most effective ways of increasing the integrity of the gas system and improving
public safety relative to natural gas.MDUG has implemented and maintains a
Damage Prevention Program,OPS 614,that meets the following criteria:
•Meets or exceeds the requirements of§192.614—Damage Prevention Program.
•Participates in One-Call programs within service territory.
• Supports the Common Ground Alliance(CGA)efforts to reduce excavation
damage through the publication and dissemination of best practices.
EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707•(208)377-6000•FAX:377-6097
OPS 610 Pipeline Patrolling and Continuing Surveillance
2.2.4.Pipeline markers are installed, visible, and legible with correct contact information.
OPS 403 Section 2 INSPECTION CRITERIA
2.13.Inspect pipeline markers.
2.13.1. Inspection includes the condition of existing pipeline marker or the need to add a
pipeline marker(s)for better visibility of the HPSS or farm tap. Examples include the
following:
2.13.1.1. In the ROW or near high traffic areas.
2.13.1.2. In vegetation that obscures visibility.
2.15. Inspect pipeline markers.
2.15.1. Inspection includes the condition of existing pipeline marker(s)or the need to add a
pipeline marker(s)for better visibility of the meter set,HPSS, or farm tap.
2.15.2. Check that pipeline markers are visible and legible with correct contact information.
Eroding(
Staff identified—23 pipeline markers that were missing,damaged,faded,or otherwise illegible,resulting in
noncompliance with required visibility and identification standards for belowground and aboveground pipelines.
Se Exhibit A below for example photographs and GPS-referenced locations of inadequate markers and Maloney
Posts.
Intermountain Gas Response
IGC respectfully disputes that this finding constitutes as a violation of 49 CFR§192.1007.
49 CFR §192.1007 establishes requirements for Distribution Integrity Management Programs (DIMP), including
threat identification (§192.1007(b)) and risk evaluation and ranking (§192.1007(c)), as referenced above. These
elements are fully addressed within Sections 3 and 4 of OPS 1000—Distribution Integrity Management Plan.
Per 49 CFR§192.1007(d),a written plan must also"[d]etermine and implement measures designed to reduce the risks
from failure of its gas distribution pipeline."DIMP is inherently structured to leverage existing operational controls
to reduce risk, such as surveillance, patrolling, and maintenance programs. Utilizing existing operational controls
meets the requirements of identifying and implementing a measure to address risk.The text of the regulation does not
provide that non-conformance of an operating control, in itself, establishes an inadequate DIMP program, or that it
fails to meet the requirements of 49 CFR§192.1007.
Three(3)pipeline markers for the locations listed below are for underground main. The pipeline markers have been
updated with new decals(see Attachment 1):
• IPUC Exhibit A: 530-538 N 3470/IGC Attachment 1: 549 N 3470 E
• IPUC Exhibit A:N 3470 E/IGC Attachment 1: 550 N 3470 E,Lewisville
• 6210 N River Road
The remaining twenty(20)locations are for high pressure service sets(HPSS).Per 49 CFR§192.707(c),as referenced,
above,"[1]ine markers must be placed and maintained along each section of a main and transmission line that is located
above ground in an area accessible to the public." A high pressure service set (HPSS) is not considered a main or
transmission line.An HPSS is a regulating facility that reduces service line pressures of 61 psig or greater to a pressure
of 60 psig or less(i.e.,first stage cut).The regulator at the meter set then reduces the pressures from 60 psig or less to
the applicable delivery pressure(i.e.,second stage cut).
HPSS inspection and maintenance requirements are outlined within OPS 304—High Pressure Service Set(HPSS)and
Farm Tap Inspection &Maintenance. Additionally, HPSSs are included in IGC's atmospheric corrosion survey as
outlined in OPS 403 — Atmospheric Corrosion and Monitoring. OPS 610 — Pipeline Patrolling and Continuing
Surveillance,as referenced above,does not apply to HPSSs.
EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608•BOISE,IDAHO 83707•(208)377-6000•FAX:377-6097
IGC evaluated the HPSSs identified by the IPUC utilizing the requirements outlined in section 2.13.of OPS 304 and
section 2.15. of OPS 403 as referenced above. Pipeline markers have been installed at the following HPSSs (see
Attachment 1):
• IPUC Exhibit A: 625 Panchen Dr/IGC Attachment 1: 635 Pancheri Dr.
• IPUC Exhibit A: 2432 S Yellowstone Hwy/IGC Attachment 1: 2460 S Yellowstone Hwy
• IPUC Exhibit A:4970 S Yellowstone Hwy/IGC Attachment 1:4976 S Yellowstone Hwy
• 2564 S Yellowstone Hwy
• 2930 S Yellowstone Hwy
• 3130 S Yellowstone Hwy
• 5606 S Yellowstone Hwy
• 5634 S Yellowstone Hwy
• 1100 Lindsey Blvd
The remaining HPSSs are located in well maintained yards. The HPSSs are clearly visible and not near the right of
way or in a high traffic area;therefore,do not require pipeline markers.
Although IGC respectfully disputes this finding as it relates to DIMP,IGC is aware of and acknowledges the systemic
issue regarding the maintenance of pipeline markers. As such, IGC has developed a plan for conducting a
comprehensive review of all districts to verify where required pipeline markers currently exist and determine where
required pipeline markers may need to be installed.IGC's Field Operations department will begin with a desktop GIS
review to verify required locations per OPS 705 — Gas Pipeline Markers and Signs Installation Inspection and
Maintenance. The GIS review will be completed by end of year 2026. In conjunction with the GIS review, IGC's
Operations Systems Programs department has begun program development within its compliance tracking software
application. Going forward, required pipeline marker locations will be individually mapped and maintained within
GIS,and pipeline marker surveys will be documented as a standalone survey in the tracking software.Following the
GIS review and program development, the locations identified during the GIS review will be physically verified in
the field.The field verification will begin in 2027 and will take place over a five year period during existing scheduled
pipeline marker surveys as required by OPS 705.Existing pipeline markers will be inspected for damage,overgrowth
that may obscure visibility,and legibility.New pipeline markers,if missing,will be installed at the required locations.
Additional training will be provided immediately to personnel responsible for maintaining pipeline markers,followed
by subsequent training on the new survey process prior to commencement of the 2027 pipeline marker survey.
Please contact Josh Sanders at(701)222-7773 with questions or comments.
Respectfully Submitted,
Pat Darras
Vice President, Engineering& Operations Services
Intermountain Gas Company
EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707•(208)377-6000• FAX:377-6097
Attachment 1
oil
y psi
-r
6210 N Rives Rd
joll
r pp
f �
EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707•(208)377-6000• FAX:377-6097
1335 Panchen DF 2460 S Yellowstone
2564 S Yellowstne
t
t
EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707•(208)377-6000• FAX:377-6097
2930 S Yellowstone 3130 S Yellowstone
- i
mummmommommow
f /
1
5606 S Yellowstone 5634YeKowskma
1i
NOW
IJ
pr 4
i
.dd
w
}4
ew