Loading...
HomeMy WebLinkAboutI202614 NOPV Response EXECUTIVE OFFICES INTERMOUNTAIN GAS COMPANY 555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707•(208)377-6000• FAX:377-6097 August 28,2026 Mr.Jeff Brooks,Programs Manager Idaho Public Utility Commission PO Box 83720 Boise,ID 83720-0074 Subject:Response to the Letter of Concern dated August 13,2026(Report#I202614) Dear Mr.Brooks, This letter is intended to address one(1)area of concern stemming from a construction inspection conducted by the Idaho Public Utilities Commission(IPUC)on August 12,2026,in Rexburg,ID,in the Idaho Falls District of the Intermountain Gas Company(IGC)pursuant of Chapter 601 Title,49,United States Code. AREA OF CONCERN 1. 49 CFR 8192,803 Definitions Qualified means that an individual has been evaluated and can: (a)Perform assigned covered tasks; and (b)Recognize and react to abnormal operating conditions. 2. 49 CFR 8192.605 Procedural manual for operations,maintenance. and emergencies. General. Each operator shall prepare and follow for each pipeline, a manual of written procedures for conducting operations and maintenance activities and for emergency response.For transmission lines,the manual must also include procedures for handling abnormal operations. This manual must be reviewed and updated by the operator at intervals not exceeding 15 months, but at least once each calendar year. This manual must be prepared before operations of a pipeline system commence.Appropriate parts of the manual must be kept at locations where operations and maintenance activities are conducted. 3. OPS 800 Operator Oualificatinn Program 1.3.Qualification Criteria: 1.3.1 An employee is considered qualified when the individual has been evaluated,and is determined to able to: 1.3.1.1.Perform specific assigned Covered Task(s),and 1.3.1.2.Recognize and react to related ADCs. 1.4. Evaluating Individual's Ability to Perform Covered Tasks: 1.4.1 Evaluations: 1.4.1.1. The evaluation of an individual's ability to perform an identified Covered Task shall include a documented process specific to the task. The evaluation of qualifications shall include an individual's ability to: 1.4.1.1.1.Perform assigned task. 1.4.1.1.2. Identify AOCs that might reasonably be anticipated in the performance of the Covered Task and required appropriate corrective action. 4. OPS 309 Snueeze-Off of Plastic Pine 2.6.When compressing the plastic pipe in temperature at or above 32°F,do so at a slow rate to allow stress relaxation in the plastic pipe.A compression rate of two(2)inches per minute(2 ipm)of the inside diameter should be maintained.For example,it should take no less than 58 seconds(0.958 minutes)to fully compress two-inch(2")IPS plastic pip(1917 inch/2ipm). EXECUTIVE OFFICES INTERMOUNTAIN GAS COMPANY 555 SOUTH COLE ROAD-P.O.BOX 7608•BOISE,IDAHO 83707•(208)377-6000• FAX:377-6097 Ambient Temp�32 F RECOMMENDED COMPRESSION RATE(min sec) Plastic Pipe Size 117 3/4" 1" 125' 2' 3' 4' 6' CTS fPS IPS IPS IPS IPS IPS IPS ID(in) 0.445 0.860 1.062 1.340 1.917 2.825 3.633 6.348 Approx time to 25%squeeze-off - - 0:08 0:10 0:14 0:21 0.27 0.40 Approx.time to 50%squeeze-off 0:06 0:13 0:16 0:20 0:29 0:42 0-55 1:20 Approx.time to 75%squeeze off 0:10 010 0:24 0:30 0:43 1:04 1:22 2:00 Approx-time to full compression 0.13 0:26 0:32 0:40 1 0758 1:25 1:49 2:40 2.7.When compressing the plastic pipe in temperature below 32°F,exercise caution because the plastic pipe may be more susceptible to squeeze off damage.A compression rate of one(1)inch per minute(1 ipm)of the inside diameter should be maintained. Ambient Temp<32 F RECOMMENDED COMPRESSION RATE(mimsec) Plastic Pipe Size 1/2" 3/4" 1" 125" 2" 3' 4" 6" CTS IPS IPS IPS IPS IPS IPS IPS ID(in) OA45 0.860 1.062 1.340 1.917 2.825 3.633 5.348 Approx time to 25%squeeze-off 0:06 0:12 0:16 0:20 0:28 0:42 0:54 1:20 Approx.time to 50%squeeze-off 0:12 0:26 1 0:32 0:40 0:58 1:24 1:50 2:40 Approx time to 75%squeeze off 0:20 0:40 0:48 1:00 126 2:08 2-44 4:00 Approx.time to full compression 0:26 0:52 1:04 1:20 1:56 2.50 3:38 5:20 2.8. When removing the squeeze-off tool in temperatures at or above 32°F,release the squeeze slowly. A release rate of 0.5 inches per minute(0.5 inches ipm)of the inside diameter should be maintained. For example,it should take no less than three(3)minutes, 50 seconds to fully release two(2")inch IPS plastic pipe(1.917 inch/0.5 ipm). Ambient Temp?32 F RECOMMENDED RELEASE RATE(min:sec) Plastic Pipe Size 1/2" 3/4" 1" 1.25" 2" 3" 4' 6' CTS IPS IPS IPS IPS IPS IPS IPS ID(in) 0.445 0.860 1.062 1.340 1.917 2.825 3.633 5.348 Approx. time to 25%release 013 0:26 0:32 0:40 0:58 1:25 1:49 2:40 Approx. time to 50O10 release 0:27 0:52 I-04 1: 1:55 2:50 3:38 5:21 Approx. time to 75%release 0:40 1:17 1.36 2:01 2:53 4:14 5:27 8.00 Total time for full release 0:53 1:43 2:07 2:41 3:50 5:39 7:16 10:42 2.9. When removing the squeeze-off tool in temperatures equal to or less than 32°F, exercise caution because the plastic pipe may be more susceptible to squeeze off damage.A release rate of 0.25 inches per minutes(0.25 ipm)of the inside diamet should be maintained. Ambient Temp<32 F RECOMMENDED RELEASE RATE(min:sec) Plastic Pipe Size 1/2" 314" 1" 1.25" 2" 3" 4" 6" CTS IPS IPS IPS IPS IPS IPS IPS ID(in) 0.445 0.860 1.062 1.340 1.917 2.825 3.633 5.348 Approx. time to 25%release 0:26 0:52 1;04 1:20 1.56 2:50 3:38 5:20 Approx.6me to 50%release O:54 1:44 1 2:08 1 2:42 3:50 5:40 7:16 10:42 Approx_time to 75%release 1:20 2:34 3:12 4;02 5:46 8:28 10:54 16:00 Approx_time for full release 146 326 4A4 5:22 7 40 1 1:18 14.32 21:24 EXECUTIVE OFFICES INTERMOUNTAIN GAS COMPANY 555 SOUTH COLE ROAD-P.O.BOX 7608•BOISE,IDAHO 83707•(208)377-6000•FAX:377-6097 5. OPS 505 Pressure Testing 2.7.PE Pipe 2.7.2.Pressure tests shall not be performed on PE materials at more than 110°F(pipe surface temperature, not ambient temperature)without prior evaluation and approval from Engineering Services.The pipe should be shaded and cooled. Cold air from a compressor on the inside will speed cooling.For exposed ends,water on the outside surface may also be used. Findin6s)• A contractor(EWN-167210)installing a service line for Work Order#12686195 was unable to answer basic Abnormal Operating Condition(AOC)questions related to the squeeze-off of plastic pipe(outlined in OPS 309),or related temperature requirements during pressure tests of plastic pipe in accordance with OPS 505. Intermountain Gas Response IGC acknowledges the finding brought forth by the IPUC as it relates to sections 1.3. and 1.4. of OPS 800 — Operator Qualification Program as referenced above. Operator qualifications were suspended, and the employee is no longer performing work on IGC job sites. Please contact Josh Sanders at(701)222-7773 with questions or comments. Respectfully Submitted, Pat Darras Vice President, Engineering& Operations Services Intermountain Gas Company