Loading...
HomeMy WebLinkAbout20171122Staff 9-12 to Avista.pdfDAPHNE HUANG DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0318 IDAHO BAR NO. 8370 RECEIVED ?0ll NOy 22 pH Z: Z0 iDAii ] I)USLICi i T il-il-l Lli COl,tMlSSlON Street Address for Express Mail: 472 W, WASHINGTON BOISE, IDAHO 83702-5918 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF AVISTA CORPORATION' S 2OI7 ELECTRIC INTEGRATED RESOURCE PLAN. CASE NO. AVU-E-17.08 SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO AVISTA CORPORATION The Staff of the Idaho Public Utilities Commission, by and through its attomey of record, Daphne Huang, Deputy Attorney General, request that Avista Corporation (Company) provide the following documents and information as soon as possible, or by MONDAY, DECEMBER ll,20t7.l This Production Request is continuing, and the Company is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents produced. Please provide answers to each question, and supporting workpapers that provide detail or are the source of information used in calculations. The Company is reminded that responses pursuant to Commission Rules of Procedure must include the name and phone number of the I Staff is requesting an expedited response. If responding by this date will be problematic, please call Staff s attorney at (208) 334-03 18. SECOND PRODUCTION REQUEST TO AVISTA ) ) ) ) ) ) ) ) I NOVEMBER22,2OI7 person preparing the document, and the name, location and phone number of the record holder- and if different, the witness- who can sponsor the answer at hearing if need be. Reference IDAPA 31.01.01.228. In addition to the written copies provided as response to the questions, please provide all Excel and electronic files on CD with formulas activated. REQUEST NO. 9: Pages l2-2 and 12-3 rndrcate that operating costs for the entire Colstrip plant are expected to increase when Units 1 and 2 close. Please describe how these increased operating costs were included when the retirement dates for Units 3 and 4 were modeled. In addition, please provide the values used for the increased operating cost in each retirement scenario and an explanation for how the increased operating cost increase numbers were determined. REQUEST NO. 10: Please provide the $lkW-yr. value for deferred T&D. 2077 Electric IRP at 5-14. REQUEST NO. 11: Please explain why Avista does not conduct energy efficiency audits of the Colstrip generation plant. 2017 Electric IRP at 5-14. REQUEST NO. 12: Please provide the following cost information in table form for each of the resources the Company modeled in its 2017 IRP to meet future resource needs: a. Type ofResource, Technology b. Nameplate (MWac) c. Nameplate (MWh for storage resources) d. Levelized Energy Costs ($/MWh) e. Levelized Capacity Costs ($/kW-mo.) f. Plant Capital ($/kW): Engineering, Procurement & Construction, Other Owner's Costs g. Fixed O&M ($/kW-mo.) h. Variable O&M ($A4Wh) SECOND PRODUCTION REQUEST TO AVISTA 2 NOVEMBER22,2OI7 i. Transmission Capital ($&W; j. Annual Capacity: Annual Capacity Factor (AC- AC,%) k. Economic Life: Years L lntegration Charge ($/MWh) m. Heat Rate (BtulkWh) nn'l Dated at Boise, Idaho, this L k day of November 2017. Deputy Attorney General Technical Staff: Rachelle Farnsworth (9-12) i:umisc:prodreq/avuelT.Sdjhrf prod req2 SECOND PRODUCTION REQUEST TO AVISTA aJ NOVEMBER22,2OI7 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 22"d DAY OF NOVEMBER 2017, SERVED THE FOREGOING SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO AVISTA CORPORATION, IN CASE NO. AVU.E-17-08, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: LINDA GERVAIS MGR REGULATORY POLICY AVISTA CORPORATION PO BOX 3727 SPOKANE WA99220-3727 E-mail: linda.eervais@avistacom.com DAVID J MEYER VP & CHIEF COLINSEL AVISTA CORPORATION PO BOX3727 SPOKANE W A 99220-3727 E-mail: david.meyer@avistacom.com CERTIFICATE OF SERVICE