Loading...
HomeMy WebLinkAboutIntermountain Gas 260721 Kuna Construction IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 260721 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 3556 E Fitz Roy St, 3062 N Lake Moreno PI City/District: Kuna Contractor/Job#: WO 12245628, Foreman: IGC Operator Supervisor: N/A WO 12245520 C. Dahl Job Description: 3/4" Service Stub System Type: 0 GD ❑ GT ❑ GG One-Call Ticket: 2026284552, 2026284551 Total Inspection Days: 2.0 Tasks: Procedure Rating j Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT Bedding with sand OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT 14-gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT Cleaning purge 18. Safety Equipment SF 418 SAT Fire Extinguisher, JSA SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pipe OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (3556 E Fitz Roy St and 3062 N Lake Moreno PI, Kuna, ID): Safety equipment, valid dig ticket, material verification, verified operator qualifications, verified equipment calibration, correct trench depth, EFV 1200, tracer wire, bedding with native soil, cleaning purge, squeeze off, backfill. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: 260722 Signature: Signature: a 6 0 Tad IPUC Form 4 Re,. 12/08/2025