HomeMy WebLinkAboutIntermountain Gas 260720 Eagle Construction IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 260720 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 7321 & 7323 Powell Place City/District: Eagle Contractor/Job#: DASCO Foreman: Dasco Operator Supervisor: N/A W012678625 W012653569 J. Rodriguez Job Description: 3/4" Service Stub System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2026280940 & 2026292962 Total Inspection Days: 2.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Pipe dated 03/26/2026 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 N/A OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation (Tracer Wire) OPS 308 N/A OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 f UNS No locate ticket on site 21. Plastic Pipe OPS 307 SAT Observed 3/"butt fusions - Joiner(s) Qualified OPS 309 Verified rollback of completed - Fusion Tools OPS 325 fusions - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (7321 & 7323 Powell Place, ID): Safety equipment, JSA, material verification, verified operator qualifications, verified equipment calibration, line locating and correct trench depth. A physical or electronic copy of a valid dig ticket was not provided to the crew, as required per NOPV response 1202308. Discrepancies: A contractor representing IGC excavated for service line installation with no hard copy or readily available electronic copy of a valid dig ticket. As per the IGC Response to NOPV I202308 (dated November 9th, 2023), "Effective December 1 st, 2023, contractor and company employees will be required to have a hard copy, or a readily available electronic copy, of the valid line locate ticket on the jobsite". IPUC staff accepted this response on November 13th, 2023. Corrective Action Required: ® Yes ❑ No Compliance Letter#: I202610 Lead Inspector: Galli Date: Reviewer: Brooks Date: 260720 �7�-7 Signature: � Signature: IPUC Form 4 Rev. 12/08/2025