HomeMy WebLinkAboutIntermountain Gas 260720 Eagle Construction IPUC Construction Inspection
Inspector(s): Galli, Green Date(s): 260720
Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160
Address: 7321 & 7323 Powell Place City/District: Eagle
Contractor/Job#: DASCO Foreman: Dasco Operator Supervisor: N/A
W012678625 W012653569 J. Rodriguez
Job Description: 3/4" Service Stub System Type: ❑X GD ❑ GT ❑ GG
One-Call Ticket: 2026280940 & 2026292962 Total Inspection Days: 2.0
Tasks: Procedure Rating Comments
1. Materials—Handling, Storage, OPS 11 SAT Pipe dated 03/26/2026
Labeling
2. Trenching/Boring—Depth, Clearance OPS 308 N/A
OPS 322
3. Bedding/Backfill OPS 308 N/A
SF 418
4. Pipe Installation (Tracer Wire) OPS 308 N/A
OPS 322
5. Valve Installation OPS 703 N/A
6. Coating Condition OPS 401 N/A
OPS 402
OPS 403
7. Manuals—Field Procedures, O & M SAT IGC procedures followed
8. Testing—Pressure, Duration, Type OPS 505 N/A
9. OQ Qualifications OPS 800 SAT Verified
10. Casing Seal/Installation OPS 325 N/A
11. Service Line Installation OPS 302 SAT
12. Tie-In/Hot Tapping OPS 600 N/A
13. Meter Location/Regulator Testing OPS 302 SAT
14. Equipment Calibration Verification OPS 501 SAT Verified
15. EFV Installation OPS 301 N/A
16. MAOP OPS 602 N/A
OPS 606
OPS 900
OPS 1000
17. Purge OPS 603 N/A
18. Safety Equipment SF 418 SAT Fire Extinguisher and JSA
SF 422
19. Abandonment OPS 607 N/A
IPUC Form 4 Rev. 12/08/2025
IPUC Construction Inspection
20. Line Locating OPS 611 f UNS No locate ticket on site
21. Plastic Pipe OPS 307 SAT Observed 3/"butt fusions
- Joiner(s) Qualified OPS 309 Verified rollback of completed
- Fusion Tools OPS 325 fusions
- Squeezing OPS 800
- Heat Plate
- Joining Procedure
22. Steel Pipe OPS 200 N/A
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
- Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
Additional Comments:
Observations included: (7321 & 7323 Powell Place, ID): Safety equipment, JSA, material verification,
verified operator qualifications, verified equipment calibration, line locating and correct trench depth. A
physical or electronic copy of a valid dig ticket was not provided to the crew, as required per NOPV
response 1202308.
Discrepancies:
A contractor representing IGC excavated for service line installation with no hard copy or readily available
electronic copy of a valid dig ticket.
As per the IGC Response to NOPV I202308 (dated November 9th, 2023), "Effective December 1 st, 2023,
contractor and company employees will be required to have a hard copy, or a readily available electronic
copy, of the valid line locate ticket on the jobsite". IPUC staff accepted this response on November 13th,
2023.
Corrective Action Required: ® Yes ❑ No Compliance Letter#: I202610
Lead Inspector: Galli Date: Reviewer: Brooks Date:
260720 �7�-7
Signature: � Signature:
IPUC Form 4 Rev. 12/08/2025