Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 260625 Boise Construction
IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 260625 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 8055 W Goddard City/District: Boise Contractor/Job#: Foreman: Operator Supervisor: DASCO W012615593 J. Rodriguez Tony Galvan Job Description: 4" Main Line & 3/4" Service Stub System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2026210149 Total Inspection Days: 2.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT Partial bedding with sand OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals —Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 SAT 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 2600 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT JSA and Fire Extinguisher SF 422 19. Abandonment OPS 607 SAT Abandoned 4-inch steel line IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 N/A 21. Plastic Pipe OPS 307 SAT Observed completed butt fusions - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (8055 W Goddard, Boise, ID): Safety equipment, JSA, valid dig ticket, material verification, verified operator qualifications, verified equipment calibration, correct trench depth, mechanical fittings (saddle tee), EFV 2600, tapping, tracer wire and partial bedding with sand. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: 260625 Signature: _ Signature: �— 41 07OCT IPUC Form 4 Rev. 12/08/2025