Loading...
HomeMy WebLinkAboutI202608 NOPV Response EXECUTIVE OFFICES INTERMOUNTAIN GAS COMPANY 555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707•(208)377-6000• FAX:377-6097 July 1,2026 Mr.Jeff Brooks,Programs Manager Idaho Public Utility Commission PO Box 83720 Boise,ID 83720-0074 Subject:Response to the Notice of Probable Violation dated June 2,2026(Report#1202608) Dear Mr.Brooks, This letter is intended to address one(1)notice of probable violation stemming from a field audit conducted by the Idaho Public Utilities Commission(IPUC)May 26-27,2026,of Intermountain Gas Company's(IGC)Nampa District pursuant to Chapter 601 Title,49 United States Code. PROBABLE VIOLATION 1. 49 CFR 8 192.605 Procedural Manual for Operations. Maintenance. and Emergencies General. Each operator shall prepare and follow for each pipeline,a manual of written procedures for conducting operations and maintenance activities and for emergency response.For transmission lines, the manual must also include procedures for handling abnormal operations.This manual must be reviewed and updated by the operator at intervals not exceeding 15 months,but at least once each calendar year.This manual must be prepared before operations of a pipeline system commence. Appropriate parts of the manual must be kept at locations where operations and maintenance activities are conducted. OPS 500 Regulator inspection and Maintenance 4. REGULATOR INSPECTION AND MAINTENANCE 4.1.Regulators shall be set to lockup at the designated lockup pressure, with some allowance for lockup fluctuation,but the regulator shall lockup at a pressure equal to or less than MAOP. 2. 49 CFR 8 192,703 General (a) No person may operate a segment of pipeline,unless it is maintained in accordance with this subpart. 3. 49 CFR 8 191-739 Pressure limiting and regulating stations: inspection and testing. (a)Each pressure limiting station,relief device(except rupture discs),and pressure regulating station and its equipment must be subjected to intervals not exceeding 15 months,but at least once each calendar year,to inspections and tests to determine that it is- (1) In good mechanical condition. (2) Adequate from the standpoint of capacity and reliability for the service in which it is employed. (3) Except as provided in paragraph(b)of this section,set to control or relive at the correct pressure consistent with the pressure limits of§ 192.201(a);and (4) Properly installed and protected from dirt,liquids,or other conditions that might prevent proper operation. Finding(s): Regulator Station 48731-RS-59980 and 48283-RS-59707 primary regulator failed to achieve lock-up. Oil was preventing lockup at Regulator station 48371-RS-59980 for the third consecutive year during IPUC field audits. Debris was found in Regulator station 48283-RS-59707 which failed due to heavy debris fouling. EXECUTIVE OFFICES INTERMOUNTAIN GAS COMPANY 555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707•(208)377-6000• FAX:377-6097 tr i O 89°E T) 9 43 846613,-116.473186#9ft ♦ 2454f' ti ' I 1, Debris Fouling Overview 48283-RS-59707 Debris Fouling Closeu 48283-RS-59707 O 317"NW 19468,-116.568295 t9ft ♦ 2418ft O 240°SW(T) • 43.619478,-116.568276±9ft ♦ 2418ft 4 Overview (oil)48371-RS-59980 Closeu (oil) 48371-RS-59980 EXECUTIVE OFFICES INTERMOUNTAIN GAS COMPANY 555 SOUTH COLE ROAD-P.O.BOX 7608•BOISE,IDAHO 83707•(208)377-6000•FAX:377-6097 intermountain (:as Resnonse Regulator Station 48283-RS-59707: The regulator was disassembled, cleaned, and reassembled onsite and subsequently locked up properly.No previous issues have been identified at this location.The primary regulator locked up as expected during the 2026,2025,2024,2023,and 2022 annual inspections. Regulator Station 4873 1-RS-59980:As stated in previous response to NOPV I202504,submitted to the IPUC July 31, 2025, IGC has been in communication with Williams to determine solutions to mitigate the oil. IGC is currently reviewing and has recentlyproposed to Williams the installation of a coalescent filter at the Nampa Gate.Per response from Williams, they will perform meter maintenance within the next 3-4 weeks, which will include the collection and testing of contaminants. Based on the results, Williams will work with manufacturers to determine the appropriate filter technology for optimum removal of contaminants(e.g., oil). Until a mitigation plan is developed and implemented,IGC will increase the inspection frequency from annual to quarterly at Regulator Station 483 71-RS-59980. On August 4,2025, IGC received a closure letter from the IPUC accepting the response and corrective actions. On June 2,2026, IGC provided updates to the IPUC via email. IGC confirmed it is continuing quarterly inspections at Regulator Station 48371-RS-59980 and actively working with Williams Northwest Pipeline on the installation of the coalescent filter. Please contact Josh Sanders at(701)222-7773 with questions or comments. Respectfully Submitted, Pat Darras Vice President, Engineering& Operations Services Intermountain Gas Company