HomeMy WebLinkAboutA202602 NOPV '���' Idaho Public Utilities Commission Brad Little,Governor ` � P.O. Box 83720,Boise,ID 83720-0074 Edward Lodge,President �� John R.Hammond,Jr.,Commissioner Dayn Hardie,Commissioner May 28, 2026 Report#A202602 Ryan Bean—Director,Natural Gas Avista Utilities 1411 Mission Ave, MSC-6 P.O. Box 3727 Spokane, WA 99220-3727 Dear Mr. Ryan Bean, On May 19-20, 2026, the Idaho Public Utilities Commission ("Commission"), Pipeline Safety Division("Staff'), conducted a Field Inspection of the Avista Utilities Moscow District, pursuant to Chapter 601 of Title 49, United States Code. Staff observed that some of the Idaho natural gas system(s) owned and operated by Avista Utilities ("Company") was out of compliance on item(s). This results in probable violations of the pipeline safety regulations Title 49, Code of Federal Regulations, Part 192. The probable violations are as follows: PROBABLE VIOLATION(S) 49 CFR 092.605 Procedural manual for operations, maintenance, and emergencies. (a) General. Each operator shall prepare and follow for each pipeline, a manual of written procedures for conducting operations and maintenance activities and for emergency response. For transmission lines, the manual must also include procedures for handling abnormal operations. This manual must be reviewed and updated by the operator at intervals not exceeding 15 months, but at least once each calendar year. This manual must be prepared before operations of a pipeline system commence. Appropriate parts of the manual must be kept at locations where operations and maintenance activities are conducted. (2) Controlling corrosion in accordance with the operations and maintenance requirements of Subpart I of this part. (b) Maintenance and normal operations. The manual required by paragraph (a) of this section must include procedures for the following, if applicable, to provide safety during maintenance and operations. (3) Making construction records, maps, and operating history available to appropriate operating personnel. AVISTA PROBABLE VIOLATIONS LETTER—Moscow FIELD Page 1 of 3 49 CFR 4 192.703 General No person may operate a segment of pipeline, unless it is maintained in accordance with this subpart. 49 CFR U92.747 Valve maintenance: Distribution systems. (a) Each valve, the use of which may be necessary for the safe operation of a distribution system, must be checked and serviced at intervals not exceeding 15 months, but at least once each calendar year. Avista Gas Standards Manual-Section 5.13 Valve Maintenance GENERAL VALVE MAINTENANCE AND INSTALLATION NOTES: Maintenance Avista gas distribution and transmission valves, based on the criteria established in Specification 2.14, Valve Design, shall be maintained to ensure they are operable and serviced according to the following schedule: Valve Category Frequency Emergency Distribution &Transmission Valves (Valves as specified in §192.179 and Once each calendar year, not §192.181)that are necessary for Emerge�cy to exceed 15 months -Operations Emergency Curb Valves (Inaccessible meter Once each calendar year, not sets, churches, schools, hospitals,jails, to exceed 15 months convalescent homes etc. Regulator Station Isolation Valve(s) (isolation Once each calendar year, not valves as specified by§192.181(b)) to exceed 15 months Every five years not to exceed Secondary Valves 63 months (This is a Best Practice but not a requirement) Findin2(s): The inlet valve associated with Regulator Station 3760 in Deary, Idaho was not identified as an emergency valve. Additionally, no annual inspection records for this valve were provided when requested and have not been made available to operating personnel as required. AVISTA PROBABLE VIOLATIONS LETTER-Moscow FIELD Page 2 of 3 REQUESTED ACTIONS A reply to this correspondence is required no later than 45 days from the date of this letter. Please submit a written reply providing a statement of all relevant facts including a complete description of the corrective action(s) taken with respect to the above referenced probable violations, and all actions to be taken to prevent future failures in these areas of concern. This written reply must be signed by a Company official with authority to bind the Company. Please send all documents to our office at 11331 W. Chinden Blvd, Boise, Idaho 83714-1021. Be advised that all material you submit in response to this enforcement action may be a public record and subject to disclosure under Idaho's Public Records Law. See Idaho Code §§74-101 et seq. If you wish to dispute any of the above referenced potential violations,you have the right to appear before the Pipeline Safety Division in an informal conference before July 12, 2026, at the above address. You have the right to present relevant documents and evidence to the Pipeline Safety Division at that conference. The Pipeline Safety Division will make available to you any evidence which indicates that you may have violated the law, and you will have the opportunity to rebut this evidence. See Commission Orders 35095 and 35334,which can be found at https://puc.idaho.gov/. If you intend to request an informal conference, please contact the Pipeline Safety Division no later than June 27, 2026. If you wish to dispute any of the allegations in this Notice,but do not want an informal conference, you may send the Pipeline Safety Division a written reply to this Notice. This written reply must be filed with the Commission on or before July 12, 2026, and must be signed by a Company official with authority to bind the Company. The reply must include a complete statement of all relevant facts, and all documentation, evidence, and argument the Company submits to refute any of the above referenced probable violations. These violations may be subject to any Commission enforcement action as allowed under Idaho law including,but not limited to,potential civil penalties in accordance with 49 CFR 190.223(a). If you have any questions concerning this Notice,please contact me at(208)334-0333. All written responses should be addressed to me at the above address, or you may fax your response to (208) 334-3762. We appreciate your attention to this matter and your effort to promote pipeline safety. Sincerely, J ff Brooks Pipeline Safety, Program Manager Idaho Public Utilities Commission 11331 W.Chinden Blvd.Ste 201-A Boise ID 83714 Telephone:(208)334-0300 Facsimile:(208)334-3762 AVISTA PROBABLE VIOLATIONS LETTER—MOSCOW FIELD Page 3 of 3