Loading...
HomeMy WebLinkAboutNorthwest Gas Processing 260714 IPUC Form 1 - NWGP Field IPUC Pipeline Safety Inspection Inspector(s): Galli, Green Date(s): 260714 Company/Owner: Unit/OPID: 39370 Northwest Gas Processing(NWGP) Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug& Alcohol: ❑ Inspection Days: 2.0 Inspection Summary 2026 Northwest Gas Processing Field Inspection July 14,2026: (2.0 Standard) (1.0 Galli) (1.0 Green) Inspectors Galli and Green reviewed records of annual valve maintenance, patrols, rectifier readings, leak survey, calibration gas, and multimeter calibrations prior to inspecting field installed operating equipment for Northwest Gas Processing in New Plymouth, ID. Following the inspection a verbal exit interview was conducted with Randy Shelton, Shelton Regulatory Consulting. Audit included: 9 CP pipe to soil readings, 1 rectifier, and functionality verification of 8 control valves. Completed and attached audit forms: PHMSA IA question set with OQ protocol 9, IPUC Form 1, Post- Inspection Preliminary Written Findings and attached inspection documents. Discrepancies No discrepancies found. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Galli Date: 260714 Reviewer: Brooks Date: ` a66 Signature: -JL/ `/� Signature: IPUC Form 1 Rev. 12/08/2025