HomeMy WebLinkAboutAvista 260519 Moscow Safety Inspection IPUC Pipeline Safety Inspection
Inspector(s): Galli, Green Date(s): 260518-260521
Company/Owner: Avista Utilities Unit/OPID: 31232
Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑
Incident: ❑ Damage Prevention: ❑ Drug& Alcohol: ❑ Inspection Days: 7.0
Inspection Summary
Avista Moscow Field Audit
May 19-20,2026: (4.0 Standard) (Galli 2.0) (Green 2.0)
Met with Avista company representatives in the Pullman, Washington district office for a briefing,
reviewed welding records, past year work orders, verified calibrations of inspection equipment and began
the field audit. Twenty-two regulator stations were inspected for relief operation, regulator lock-up,
general condition of the station including pipe-to-soil wrap, and cathodic protection. Three rectifiers, six
carrier-to-casings, thirty-one control valves and one high-pressure service set were also inspected.
May 21, 2026: (2.0 Standard) (Galli 1.0) (Green 1.0)
IPUC inspector Galli and Green traveled back to Boise, Idaho.
May 26, 2026: (1.0 Standard) (Galli 1.0)
Wrote inspection report, completed audit forms: PHMSA IA question set with OQ protocol 9,
IPUC Form 1, Post-Inspection Preliminary Written Findings, attached inspection documents and wrote
NOPV A202602.
Discrepancies:
• The inlet valve at Regulator Station 3760 was not listed in Maximo, no annual inspection data.
• Soil erosion has occurred around Regulator Station 369. Recommend adding topsoil and/or gravel
to restore proper grade and prevent further washout.
• The pipe-to-soil interface at HPSS 3089 was damaged, exposing bare steel. The regulator
technician removed the damaged wrap and painted the exposed steel on-site. Wax wrap was
applied the following day.
Corrective Action Required: ® Yes ❑ No Compliance Letter#: A202602
Lead Inspector: Galli Date: Reviewer: Brooks Date:
260528
Signature: Signature:
IPUC Form 1 Rev. 12/08/2025