HomeMy WebLinkAboutIntermountain Gas 260422 Idaho Falls Safety Inspection IPUC Pipeline Safety Inspection
Inspector(s): Perkins Date(s): 22-23 April 2026
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Standard: ❑ Training: ❑ TIMP/DIMP: M OQ: ❑
Incident: ❑ Damage Prevention: M Drug&Alcohol: ❑ Inspection Days: 1.0
Inspection Summary
April 22-23,2026: (0.5) DIMP (0.5)Damage Prevention
IPUC inspector Perkins conducted a sample damage prevention and line marker audit in the Idaho Falls
District of Intermountain Gas Company. Wrote NOPV and completed forms.
Discrepancies:
Routine inspection identified 23 pipeline markers that are missing, damaged, faded, or otherwise illegible,
resulting in noncompliance with required visibility and identification standards for underground pipelines.
Corrective Action Required: M Yes ❑ No Compliance Letter#: I202605
Lead Inspector: Perkins Date: Reviewer: Brooks Date:
23 April 2026
Signature: Signature: Zb051�
IPUC Form 1 Rev. 12/08/2025