Loading...
HomeMy WebLinkAboutIntermountain Gas 260416 Nampa Safety Inspection IPUC Pipeline Safety Inspection Inspector(s): Perkins Date(s): 16 April 2026 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Standard: ❑ Training: ❑ TIMP/DIMP: M OQ: ❑ Incident: ❑ Damage Prevention: M Drug & Alcohol: ❑ Inspection Days: 1.0 Inspection Summary April 16,2026: (0.5)DIMP (0.5)Damage Prevention IPUC inspector Perkins conducted a sample damage prevention and line marker audit in the Nampa District of Intermountain Gas Company. Wrote NOPV and completed forms. Discrepancies: Routine inspection identified 37 pipeline markers that are missing, damaged, faded, or otherwise illegible, resulting in noncompliance with required visibility and identification standards for underground pipelines. In addition, locate wires were found disconnected within multiple Maloney posts,preventing proper tracing and identification of the buried facilities. Corrective Action Required: M Yes ❑ No Compliance Letter#: I202604 Lead Inspector: Perkins Date: Reviewer: Date: 16 April 2026 Signature: Signature: Z60q/6 IPUC Form 1 Rev.12/08/2025