Loading...
HomeMy WebLinkAboutAvista 260531-260605 Kellogg Construction IPUC Construction Inspection [17 ector(s): Perkins Date(s): 260531-260605 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: 1033 Big Creek Road City/District: Kellogg Contractor/Job #: 1036741643, Foreman: Avista Operator Supervisor: None 1036742468 L. Huber Job Description: GFRP - BIG CREEK PH 1 2" Service, System Type: ❑x GD 4"Main extension One-Call Ticket: N/A Total Inspection Days: 6.0 Tasks: Procedure# Rating Comments 1. 'Materials-Handling, Storage, Labeling 3.12-3.13 SAT Pics of pipe in file 2. Trenching/Boring-Depth, Clearance 3.15 SAT 36" 3. Bedding/Backfill 3.15 SAT Sand/Native soil 4. Pipe Installation(Tracer Wire) 3.13 SAT 5. Valve Installation 2.14 SAT 4" & 2" Isolation valves 6. Coating Condition 2.12 N/A 7. Manuals-Field Procedures, O & M 1.4 SAT All procedures followed 8. Testing-Pressure, Duration, Type 2.12-13/3.18 N/A 9. OQ Qualifications 4.31 SAT Verified 10. Casing Seal/Installation 3.42 N/A 11. Service Line Installation 3.16 SAT 2" 12. Tie-In/Hot Tapping 3.32 N/A 13. Meter Location/Regulator Testing 2.22 N/A 14. Equipment Calibration Verification 5.11,14,21 SAT Pyrometer on site, electro fuse machine 15. EFV Installation 3.16 N/A 16. MAOP 4.15 N/A 17. Purge 3.17 N/A 18. Safety Equipment GESH 4 SAT Fire Extinguisher and JSA 19. Abandonment 5.16 N/A 20. Line Locating 4.13 SAT 21. Plastic Pipe 3.23-25 SAT Butt fusing, Lyco fittings and Electro - Joiner(s) Qualified 3.34 fusing - Squeeze - Fusion Tools IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection - Heat Plate - Joining Procedure 22. Steel Pine N/A - Welder(s) Qualified 3.22 Pipe/Coating—Inspected/Repaired 2.12 - Cathodic Protection 2.32 -Non-Destructive Testing 3.12 - Welding Procedures - Removal of asbestos wrap - Exothermic Welding Additional Comments: IPUC staff traveled to CDA to observe construction in Kellogg, Idaho, on 31 May 2026. Job Description: Install new PE transition and replace (AA)Aldy-A with approximately 545' +/- 2" PE main and abandon existing AA Pipe. Asphalt cut, permit. Pictures of job site, progress are attached to file. Observations include: Safety equipment, JSA, material verification, line locating, stringing pipe, verified operator qualifications, missile shot for 2"pipe under road, excavating, correct trench depth, electro fusing, lyco fitting and butt fusing 4" & 2"PE, inserting 4"pipe into 6" lined casing within bridge wall and reinforcing pipe ends on pipe sleeve for backfill/concrete, tracer wire, bedding/backfilling of 545' of 4" main. All observed procedures were followed in accordance with Avista procedures IPUC staff traveled back to Boise, Idaho, and completed all paperwork on 5 June 2026. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: P kins Date: Reviewer: Brooks Date: 260605 6 d_� Signature: Signature: //,/�---_ �t IPUC Form 4 Rev. 12/08/2025