Loading...
HomeMy WebLinkAboutIntermountain Gas 260527 Nampa Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 260527 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 17580 Moon Ridge Pl, 10076 Longtail Dr City/District: Nampa Contractor/Job#: IGC Foreman: IGC Operator Supervisor: None W012580978, W012556979 T. Wallace Job Description: 3/4" Service Lines System Type: M GD ❑ GT ❑ GG One-Call Ticket: 2026221157,2026200252 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT _OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation i OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pipe OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate -Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (17580 Moon Ridge Place, Nampa, ID): Safety equipment, valid dig ticket, material verification, verified operator qualifications, verified equipment calibration, correct trench depth, successful pressure test of 99 psi for 15 minutes, verified proper rollback of 3/"butt fusion, mechanical fittings (met-fit tee and coupler), squeeze off, 1200 EFV, tracer wire, bedding/backfill with native soil, purge from riser and continuity test. Quizzed employees on applicable AOCs of mechanical fittings. All observed procedures were followed in accordance with IGC procedures. Observations included: (10076 Longtail Drive, Nampa, ID): Safety equipment, valid dig ticket, line locating, material verification, verified operator qualifications, verified equipment calibration, correct trench depth, thumper bore, verified proper rollback of 3/"butt fusion, 1200 EFV, tracer wire, successful pressure test of 97 psi for 15 minutes, mechanical fittings (met-fit coupler), squeeze off and bedding/backfill with native soil. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: 260527 Signature: Signature: 06�y IPUC Form 4 Rev.12/08/2025