Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 260527 Nampa Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 260527 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 17580 Moon Ridge Pl, 10076 Longtail Dr City/District: Nampa Contractor/Job#: IGC Foreman: IGC Operator Supervisor: None W012580978, W012556979 T. Wallace Job Description: 3/4" Service Lines System Type: M GD ❑ GT ❑ GG One-Call Ticket: 2026221157,2026200252 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT _OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation i OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pipe OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate -Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (17580 Moon Ridge Place, Nampa, ID): Safety equipment, valid dig ticket, material verification, verified operator qualifications, verified equipment calibration, correct trench depth, successful pressure test of 99 psi for 15 minutes, verified proper rollback of 3/"butt fusion, mechanical fittings (met-fit tee and coupler), squeeze off, 1200 EFV, tracer wire, bedding/backfill with native soil, purge from riser and continuity test. Quizzed employees on applicable AOCs of mechanical fittings. All observed procedures were followed in accordance with IGC procedures. Observations included: (10076 Longtail Drive, Nampa, ID): Safety equipment, valid dig ticket, line locating, material verification, verified operator qualifications, verified equipment calibration, correct trench depth, thumper bore, verified proper rollback of 3/"butt fusion, 1200 EFV, tracer wire, successful pressure test of 97 psi for 15 minutes, mechanical fittings (met-fit coupler), squeeze off and bedding/backfill with native soil. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: 260527 Signature: Signature: 06�y IPUC Form 4 Rev.12/08/2025