Loading...
HomeMy WebLinkAboutAvista 260521-22 Hayden Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 260521-22 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: 4945 E. Lancaster Rd City/District: Hayden Contractor/Job #: 1036806721, L. Roburg Operator Supervisor: None 1036792669 Job Description: 2" main-'/" Service Line System Type: ❑X GD One-Call Ticket: No dig ticket. Total Inspection Days: 2.0 Customer provided trenches Tasks: - Procedure# Rating Comments 1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT 2. Trenching/Boring-Depth, Clearance 3.15 N/A Customer provided 36" 3. Bedding/Backfill 3.15 SAT 16" sand 4. Pipe Installation (Tracer Wire) 3.13 SAT 5. Valve Installation 2.14 N/A 6. Coating Condition 2.12 N/A 7. Manuals-Field Procedures, O & M 1.4 SAT All procedures followed 8. Testing-Pressure, Duration, Type 2.12-13/3.18 SAT 100 PSI-3 hour 9. OQ Qualifications 4.31 SAT Verified 10. Casing Seal/Installation 3.42 N/A 11. Service Line Installation 3.16 SAT 12. Tie-In/Hot Tapping 3.32 N/A 13. Meter Location/Regulator Testing 2.22 N/A 14. Equipment Calibration Verification 5.11,14,21 SAT 15. EFV Installation 3.16 SAT 1200 16. MAOP 4.15 N/A 17. Purge 3.17 SAT 18. Safety Equipment GESH 4 SAT Fire Extinguisher and JSA 19. Abandonment 5.16 N/A 20. Line Locating 4.13 SAT No locate tickets, everything exposed 21. Plastic Pipe 3.23-25 SAT Lyco fittings - Joiner(s) Qualified 3.34 - Squeeze - Fusion Tools - Heat Plate - Joining Procedure IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection 22. Steel Pipe N/A - Welder(s) Qualified 3.22 Pipe/Coating—Inspected/Repaired 2.12 - Cathodic Protection 2.32 -Non-Destructive Testing 3.12 - Welding Procedures -Removal of asbestos wrap - Exothermic Welding Additional Comments: Observations include: Safety equipment, JSA, material verification, verified operator qualifications, correct trench depth, pressure test, EFV's,purging, bedding of 2700' 2"main and 30' of 3/" service and setting risers. All observed procedures were followed in accordance with Avista procedures. IPUC staff traveled back to Boise and completed paperwork, 22 May 2026. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Perkins Date: Reviewer: Brooks Date: 260522 Signature: Signature: IPUC Form 4 Rev. 12/08/2025