Loading...
HomeMy WebLinkAboutAvista 260520 Rathdrum Post Falls Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 260520 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: See below City/District: Rathdrum-Post Falls Contractor/Job#: 1036761613, A. Murphy Operator Supervisor: None 1036762574, 1036762510, 1036783578 Job Description: %" Service Lines System Type: © GD One-Call Ticket: No dig ticket. Total Inspection Days: 1.0 Customer provided trenches Tasks: Procedure# Rating Comments 1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT Gas Scan 2. Trenching/Boring-Depth, Clearance 3.15 N/A Customer provided 30" 3. Bedding/Backfill 3.15 SAT 4. Pipe Installation (Tracer Wire) 3.13 SAT 5. Valve Installation 2.14 N/A 6. Coating Condition 2.12 N/A 7. Manuals-Field Procedures, O & M 1.4 SAT All procedures followed 8. Testing-Pressure, Duration, Type 2.12-13/3.18 SAT 100 PSI-15 Min 9. OQ Qualifications 4.31 SAT Verified 10. Casing Seal/Installation 3.42 N/A 11. Service Line Installation 3.16 SAT 12. Tie-In/Hot Tapping 3.32 N/A 13. Meter Location/Regulator Testing 2.22 SAT 14. Equipment Calibration Verification 5.11,14,21 SAT 15. EFV Installation 3.16 SAT 1200 16. MAOP 4.15 N/A 17. Purge 3.17 SAT 18. Safety Equipment GESH 4 SAT Fire Extinguisher and JSA 19. Abandonment 5.16 N/A 20. Line Locating 4.13 SAT No locate tickets, everything exposed 21. Plastic Pipe 3.23-25 SAT Lyco fittings - Joiner(s) Qualified 3.34 - Squeeze - Fusion Tools - Heat Plate IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection - Joining Procedure 22. Steel Pine N/A - Welder(s) Qualified 3.22 Pipe/Coating—Inspected/Repaired 2.12 - Cathodic Protection 2.32 -Non-Destructive Testing 3.12 - Welding Procedures - Removal of asbestos wrap - Exothermic Welding Additional Comments: Observations included (3596 N Leighton St, 3223 N Van Winkle St (Post Falls), 9066 W Swather, 9042 W Swather(Rathdrum): Safety equipment, JSA, material verification, verified operator qualifications, correct trench depth, pressure test, EFV's, purging, bedding, backfilling, setting meter bars and risers. All observed procedures were followed in accordance with Avista procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Perkins Date: Reviewer: Brooks Date: 260520 Signature: Signature: IPUC Form 4 Rev. 12/08/2025