Loading...
HomeMy WebLinkAboutAvista 260519 Rathdrum Hayden Post Falls Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 260519 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: See below City/District: Rathdrum-Hayden-Post Falls Contractor/Job #: 1036632662, Foreman: Operator Supervisor: None 1036769221, 1036735399 J. Lemmon Job Description: %" Service Lines System Type: ❑X GD One-Call Ticket: No dig ticket. Total Inspection Days: 1.0 Customer provided trenches Tasks: Procedure# Rating Comments 1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT Gas Scan 2. Trenching/Boring-Depth, Clearance 3.15 N/A Customer provided 30" 3. Bedding/Backfill 3.15 SAT 4. Pipe Installation(Tracer Wire) 3.13 SAT 5. Valve Installation 2.14 N/A 6. Coating Condition 2.12 N/A 7. Manuals-Field Procedures, O & M 1.4 SAT All procedures followed 8. Testing-Pressure, Duration, Type, 2.12-13/3.18 SAT 100 PSI-15 Min 9. OQ Qualifications 4.31 SAT Verified 10. Casing Seal/Installation 3.42 N/A 11. Service Line Installation 3.16 SAT 12. Tie-In/Hot Tapping 3.32 N/A 13. Meter Location/Regulator Testing 2.22 SAT 14. Equipment Calibration Verification 5.11,14,21 SAT 15. EFV Installation 3.16 SAT 1200 16. MAOP 4.15 N/A 17. Purge 3.17 SAT 18. Safety Equipment GESH 4 SAT Fire Extinguisher and JSA 19. Abandonment 5.16 N/A 20. Line Locating 4.13 SAT No locate tickets, everything exposed 21. Plastic Pipe 3.23-25 SAT - Joiner(s) Qualified 3.34 - Squeeze - Fusion Tools - Heat Plate IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection - Joining Procedure 22. Steel Pipe N/A - Welder(s) Qualified 3.22 Pipe/Coating—Inspected/Repaired 2.12 - Cathodic Protection 2.32 -Non-Destructive Testing 3.12 -Welding Procedures - Removal of asbestos wrap - Exothermic Welding Additional Comments: IPUC staff traveled from Moscow to Coeur d'Alene, 19 May 2026. Observations included (11494 N Caravan Ln) (Hayden): Safety equipment, JSA, material verification, verified operator qualifications and correct trench depth. Lyco fittings, bedding and backfill. Customer had not completed the trench so that's all that was observed. All observed procedures were followed in accordance with Avista procedures. Observations included (6143 W Pelican Loop (Rathdrum), 3670 N Heton St and1528 N Wilhem Way (Post Falls): Safety equipment, JSA,material verification, verified operator qualifications, correct trench depth, pressure test, EFV's, purging, bedding, backfilling, setting meter bars and risers. All observed procedures were followed in accordance with Avista procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Perkins Date: Reviewer: Brooks Date: J 260519 l� Signature: Signature: 160 bl1 IPUC Form 4 Rev. 12/08/2025