HomeMy WebLinkAboutAvista 260519 Rathdrum Hayden Post Falls Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 260519
Company/Owner: Avista Utilities Unit/OPID: 31232
Address: See below City/District: Rathdrum-Hayden-Post Falls
Contractor/Job #: 1036632662, Foreman: Operator Supervisor: None
1036769221, 1036735399 J. Lemmon
Job Description: %" Service Lines System Type: ❑X GD
One-Call Ticket: No dig ticket. Total Inspection Days: 1.0
Customer provided trenches
Tasks: Procedure# Rating Comments
1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT Gas Scan
2. Trenching/Boring-Depth, Clearance 3.15 N/A Customer provided 30"
3. Bedding/Backfill 3.15 SAT
4. Pipe Installation(Tracer Wire) 3.13 SAT
5. Valve Installation 2.14 N/A
6. Coating Condition 2.12 N/A
7. Manuals-Field Procedures, O & M 1.4 SAT All procedures followed
8. Testing-Pressure, Duration, Type, 2.12-13/3.18 SAT 100 PSI-15 Min
9. OQ Qualifications 4.31 SAT Verified
10. Casing Seal/Installation 3.42 N/A
11. Service Line Installation 3.16 SAT
12. Tie-In/Hot Tapping 3.32 N/A
13. Meter Location/Regulator Testing 2.22 SAT
14. Equipment Calibration Verification 5.11,14,21 SAT
15. EFV Installation 3.16 SAT 1200
16. MAOP 4.15 N/A
17. Purge 3.17 SAT
18. Safety Equipment GESH 4 SAT Fire Extinguisher and JSA
19. Abandonment 5.16 N/A
20. Line Locating 4.13 SAT No locate tickets, everything exposed
21. Plastic Pipe 3.23-25 SAT
- Joiner(s) Qualified 3.34
- Squeeze
- Fusion Tools
- Heat Plate
IPUC Form 4 Rev.12/08/2025
IPUC Construction Inspection
- Joining Procedure
22. Steel Pipe N/A
- Welder(s) Qualified 3.22
Pipe/Coating—Inspected/Repaired 2.12
- Cathodic Protection 2.32
-Non-Destructive Testing 3.12
-Welding Procedures
- Removal of asbestos wrap
- Exothermic Welding
Additional Comments:
IPUC staff traveled from Moscow to Coeur d'Alene, 19 May 2026.
Observations included (11494 N Caravan Ln) (Hayden): Safety equipment, JSA, material verification,
verified operator qualifications and correct trench depth. Lyco fittings, bedding and backfill. Customer had
not completed the trench so that's all that was observed. All observed procedures were followed in
accordance with Avista procedures.
Observations included (6143 W Pelican Loop (Rathdrum), 3670 N Heton St and1528 N Wilhem Way
(Post Falls): Safety equipment, JSA,material verification, verified operator qualifications, correct trench
depth, pressure test, EFV's, purging, bedding, backfilling, setting meter bars and risers. All observed
procedures were followed in accordance with Avista procedures.
Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA
Lead Inspector: Perkins Date: Reviewer: Brooks Date:
J 260519 l�
Signature: Signature: 160 bl1
IPUC Form 4 Rev. 12/08/2025