Loading...
HomeMy WebLinkAboutIntermountain Gas 260512 Meridian Construction IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 260512 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 7083,7099 S Averill Ln City/District: Meridian Contractor/Job#: DASCO Foreman: Operator Supervisor: None W012562173, W012562158 DASCO H. Talamantez Job Description: 3/4" Service Lines System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2026191309, 2026191308 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance , OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pine OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Weldin OPS 403 Additional Comments: Observations included: (7083 and 7099 S Averill Ln, Meridian, ID): Safety equipment, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, successful pressure test of 100 psi for 15 minutes, verified proper rollback of 1/"butt fusion, squeeze off, 1200 EFV, tracer wire, bedding/backfill with sand, purge from riser and continuity test. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: 260512 Signature: ` `��� Signature: IPUC Form 4 Rev. 12/08/2025