Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 260512 Meridian Construction
IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 260512 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 7083,7099 S Averill Ln City/District: Meridian Contractor/Job#: DASCO Foreman: Operator Supervisor: None W012562173, W012562158 DASCO H. Talamantez Job Description: 3/4" Service Lines System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2026191309, 2026191308 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance , OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pine OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Weldin OPS 403 Additional Comments: Observations included: (7083 and 7099 S Averill Ln, Meridian, ID): Safety equipment, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, successful pressure test of 100 psi for 15 minutes, verified proper rollback of 1/"butt fusion, squeeze off, 1200 EFV, tracer wire, bedding/backfill with sand, purge from riser and continuity test. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: 260512 Signature: ` `��� Signature: IPUC Form 4 Rev. 12/08/2025