Intermountain Gas 260415 Eagle Construction Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 260415 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 2149 E Hidden Cove Ln City/District: Eagle Contractor/Job #: Dasco- Foreman: Operator Supervisor: None W012548245 J. Rodriguez Job Description: 2" Service Line System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2026151545 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, 1 OPS 11 SAT 2"inch dated 8/2024 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 24" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Sand/Native soil SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 _ 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation i OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electric 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 EFV 5500 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 _ 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pipe OPS 307 SAT Observed 2"butt fusions and electro- - Joiner(s) Qualified OPS 309 fusion - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (2149 E Hidden Cove Ln, Eagle, ID): Safety equipment, JSA, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, verified proper rollback of 2"butt fusions, 2" electro-fusion tapping tee, tracer wire, bedding/backfill with sand/native soil. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Perkins Date: Reviewer: Brooks Date: ,� 260415 Signature: � � Signature: ahoy 15 IPUC Form 4 Rev.12/08/2025