Loading...
HomeMy WebLinkAboutIntermountain Gas 260429 Pocatello Construction Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 260429 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: 8851 N Kraft Road City/District: Pocatello Contractor/Job#: Foreman: Operator Supervisor: IGC Form 457 M. McCurry Phillip Colborn Job Description: Leak Repair on 2"Main System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2026182602 Total Inspection Days: 1 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation(Tracer Wire) OPS 308 N/A OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT Leak test with soap 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 N/A 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT JSA and Fire Extinguisher SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Ray.12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pipe OPS 307 SAT -Joiner(s) Qualified OPS 309 -Fusion Tools OPS 325 - Squeezing OPS 800 -Heat Plate -Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s)Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 -Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 -Exothermic Welding OPS 403 Additional Comments: Observations included(8851 N Kraft Road, Pocatello,ID)(Aldyl-A leak repair): Safety equipment,JSA, valid dig ticket, line locating(hand dig to daylight main), verified operator qualifications, correct trench depth, squeeze off,mechanical fittings(met-fit couplers), leak test with soap and bedding with sand. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: 260429 Signature: (_ Signature: IPUC Form 4 Rev.12/08/2025