Loading...
HomeMy WebLinkAboutIntermountain Gas 260422-23 Menan Construction Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 260422-23 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: The Buttes division#1, behind Valleywide City/District: Menan Contractor/Job#: KV-Utilities Foreman: Operator Supervisor: None W012480713 R.Wilson Job Description: 2" and 4" backbone System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2026161242 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT Sand,bedding/shading SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 _ 7. Manuals—Field Procedures, O&M SAT IGC procedures followed 8. Testing—Pressure,Duration,Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Pot holing 21. Plastic Pipe OPS 307 SAT Fusing -Joiner(s) Qualified OPS 309 -Fusion Tools OPS 325 - Squeezing OPS 800 -Heat Plate -Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s)Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 -Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 -Exothermic Welding OPS 403 Additional Comments: Observations included: (The Buttes#1,Menan, ID): Safety equipment,valid dig ticket,verified operator qualifications,verified equipment calibration, correct trench depth,bedding/shading 2"in trench, stringing 4"pipe along roadway,verified proper rollback of 2&4"butt fusion, tracer wire,boring and potholing. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Perkins Date: Reviewer: Brooks Date: 260423 Signature: Signature: a6 O S 1; IPUC Form 4 Rev.12/08/2025