Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 260420 Ucon Construction Construction
IPUC Constriction Inspection Inspector(s): Perkins Date(s): 260420 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: 9347 N 25"E City/District: Ucon Contractor/Job#: KV-Utilities Foreman: Operator Supervisor: None W012471833 M.Doig Job Description: 3/4" Service Line/HPSS removal System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2026142184 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT Pull back after bore OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O&M SAT IGC procedures followed 8. Testing—Pressure,Duration,Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT Only witnessed pull back on bore 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Pot holing 21. Plastic Pipe OPS 307 SAT Fusing -Joiner(s)Qualified OPS 309 -Fusion Tools OPS 325 - Squeezing OPS 800 -Heat Plate -Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 -Exothermic Welding OPS 403 Additional Comments: Observations included: (9347 N 25`h E,Ucon, ID): Safety equipment,valid dig ticket,verified operator qualifications,verified equipment calibration, correct trench depth, verified proper rollback of/a"butt fusion, 1200 EFV,tracer wire, boring and pullback of service line, and potholing. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: erkins Date: Reviewer: Brooks Date: 260420 i6 p 5 I Signature:. Signature: IPUC Form 4 Ray.12/08/2025