HomeMy WebLinkAbout20160906AVU to Staff 135 Attachment B - Segment Reconductor and FDR Tie Program.pdfAtlDD& Capital Program Business Case
Investment Name: Segment Reconductor & FOR 11e Program
Requested Amount J5,ooo,ooo (rev 8/11/16 dcj) Assessments: -
Duration/Timeframe on-going Year Program -Financial:
Dept .. , Area: Distribution Engineering Strategic:
Owner: David Howell Business Risk:
Sponsor: Heather Rosentrater Program Risk:
Category: Program
Mandate/Reg. Reference: n/a Assessment Score:
Recommend Program Oescrip~on:
The Company's Distribution Grid system includes 18,000 circuit miles of overhead and underground
primary conductors. As load and generation patterns shift, certain areas (segments) of the system
become thermally overloaded. These constrained portions of the system are identified through
systematic planning studies or from operational studyworks conducted by Area Engineers. In addition,
FDR 'Tie' switches are installed to allow load shifts between FDR circuits to balance loads and in response
to either maintenance or forced outages. (rev 8/11/16 --- a portion of the "Worst FDR"program will be
incornorated with this nro.,ram. Startin" in 2017 $1M will be added to Seement Reconductor and
Alfefnatlve.s;
Unfunded Program: Avista's Distribution System Planning criteria (e.g. 500 A Plan) mandates
performance levels for distribution circuits including capacity and voltage
requirements. This program is aimed at maintaining compliance with
planning criteria.
Alternative 1: Brief name Describe other options that were considered
of alternative (if
applicable)
Alternative 2: Brief name Describe other options that were considered
of alternative (if
applicable)
Alternative 3 Name : Brief Describe other options that were considered
name of alternative (if
applicable)
Pr~~ Cash Flows
Capital Cost O&MCost Other Costs Approved
2015 s 3,735,000 s -$ -$ 3,573,505
2016 s 3,810,000 s . $ -s 3,810,000
2017 s 5,000,000 s $ -s 4,175,000
2018 s 5,000,000 $ -s -$ 3,900,000
2019 $ 5,000,000 $ -$ -$ 4,000,000
2020 s 5,000,000 $ -$ . $ 4,000,000
2021+ $ 5,000,000 s . $ -$ .
Total $ 32,545,000 $ -$ -$ 23,458,SOS
Page 1 of 4
Staff_PR_ 135 Attaachment B
'<'i..: 9.50%
Reliability & capacity
Business Risk Reduction >10 and<= 15
High certainty around cost, schedule and resources
105 Annual Cost Summary -lncrease/(Deaeasel
Performancie Capital Cost O&MCost Other Costs Business Rl,sk Score
Electric s 5,000,000 s -s -4
Delivery
Capacity
Annual Cost Summary• lnaease/(Decrea.se)
Performance Capital Cost O&MCost Other Costs Business Risk Scor~
n/a $ -$ . s -16
describe any $ . $ -$ -4
incremental
changes in
operations
describe any s -s . s -0
incremental
changes in
operations
describe any $ -s . $ -0
incremental
changes in
operations
Assoclat~ Ers (list all applicable):
2514 2515 2516
Printed: 9/1!'2016
G \2016\2016 ID ELEC GRC\Produt11on Reques1s\Oulft\Dave\Segment Reconductor and FDR ne Prorgam_D62fi15
Page 1 of4
Capital Program Business Case
'tfl5WI(
ER 2016 2017 2018 2019 2020 Total Mandate Excerpt (if applicable):
2514 $ 2,000,000 $ 2,675,000 $ 2,500,000 $ 2,500,000 $ 2,500,000 $ 12,175,000 Avista Distribution Planning Criteria (500 Amp)
2515 $ 1,000,000 $ 1,250,000 $ 1,250,000 s 1,250,000 $ 1,250,000 $ 6,000,000
2516 $ 810,000 $ 1,250,000 $ 1,250,000 $ 1,250,000 $ 1,250,000 $ 5,810,000
0 $ -$ -$ -$ -$ -s -
0 $ -$ -$ -$ -$ -s -
0 $ -$ -$ . s . s -$ -
0 $ -$ . $ . $ . s -$ .
0 $ . $ -$ -$ . $ -$ -Additional Justifications:
0 $ -$ -$ -$ . $ -s -This program is a foundational element of the Company's
0 $ -s . s -$ . $ -$ -overall effort to maintain the electric delivery system.
0 $ -$ -$ -$ . $ . $ -While many of the asset managmeent program such as
0 $ -s -$ -$ . $ . $ -WPM, TCOP, Worst Feeders, and Grid Mod are targeted
0 $ -$ . s -s . $ . $ -efforts to maintain reliability, this program specifically
0 $ . $ . $ -$ . s . s . identifies thermal, voltage, and capacity 'tie' constraints.
0 s -$ -s -$ -$ -s -The program represents the collective effort of distibution
0 $ -$ -s -$ -$ . $ -planners and area engineers to manager our ability to
Total $ 3,810,000 $ 5,175,000 $ 5,000,000 s 5,000,000 s 5,000,000 $ 23,985,000 serve customer load. efficientlv. and securelv.
Resour~es Requirements: (requ_estforms and approvals attached)_ -~-----~
------' -----
Internal Labor Availability: O Low Probability 0 Medium Probability G High Probabiity Enterprise Tech: 0 YES -attach foon 0 NO or Not Required
Check the appropriate box. The internal and contract I
labor boxes should be checked to indicate if the
Contract Labor: DYES GNO Facilities: 0 YES -atrach foon G NO or Not Required resource owners have been contacted and to provide
Capital Tools: 0 YES -attach foon G NO or Not Required a general sense of how likely staff will be provided
Fleet: 0 YES -attach form G NO or Not Required (this does not require a firm committment). '
Key Performance lndlcator(s) -----~-:--1
Elipected Perfonm,oce. lmprCM:menlS
KPI Measure: Scada Variable Limit (6/29/15 ) Ar/-1620, 93F, Area Load 2007 MW
Prepared
-r %Ldg 1 I Loading (A) Rating (A)
Top 10 ~% OCRated! Feeders L --
1 HOLBROOK CB 1206
2 lOTH_ST\V CB 1263
3 POUNDLN CB 1201
4 LIBRTYLK CB 12F3
5 WAIKIKI CB I2F2
6 LOLO CB 1359
7 CDALE:NE CB 125
8 WAIKIKI CB 12.F3
9 CRTCHFLD CB UlO
10 ROSSPARK CB 12Fl
Page 2 of 4
Staff_PR_ 135 Attaachment B
443.0 454.2 97 .5
425.2 538.3 79.0
410.8 538.3 76.3
420.0 559.3 15.1.
418.0 559.3 74 .7
306.0 435.6 70.3
389.2 554.7 70.2
392.0 559.3 70.1
375.0 538.3 69.7
443.0 641. 7 69.0
Reviewed signature r \
)ther Party Review signature
(if necessary)
~1'2 i ~uJJ [ L
Director/Manager -
Director/Manager
PITlted: 91'1/2016
G \2016\201610 ELEC GRC\PrOOJCllon ~equests\Oralt\Oave\Segment Recondoctor and FDR Tie Prorgam_062615
Page 2 of4
'DI'
To be completed by Capital Pla.nning Group
Rationale for decision
Page 3 of 4
Staff_PR_ 135 Attaachment B
Capital Program Business Case
ROX 751 -Reconductor (see 2414) Mica Peak Cnv to URD COB 12F2 Green BluffTie LOO 12F2 Deer Lk Narrows Xing COB 12Fl Recond
Midway 1 Mi DEE 12F2 Bear Lk-AntlerTie DEE 12F2 Recond to LOO 12F1 SOT 522/523 -Recond-6A WAS781-lnterset Poles LL-Cnv OH to
UG (USFWS) LIB 12F2 -Henry Rd Tie CHE 12Fl-12F4 Tie on Bowdish U District FDR Tie Trent Ave DEE 12F2 -Recond 2/0 ACSR LIB 12F1-
EFM 12F2 Rocky Hill Tie BKR 12F2 -Tie to EFM 12Fl 3HT 12F7 Tie U District Loop BKR 12F3 Recond 2/0 CU on Mission EFM 12Fl -State Ln
Bridge -Conv OH/UG 9CE 12F4 Recond 336 9CE 12F2 -Tie to Chester 12F2 SLK 12F1 -Recond 2.1 mi C&W 12F4 -Tie to 3HT 12F7 9CE 12F3
, Thierman/Mission Red 1 mi BKR 12F1 -Liberty Lk 12F2 on Mission CHW12F2-Angel Pk Recond 0.75mi GRN12Fl Tie to QV12F2 4.5 mi GIF
34Fl -CHW 12F3 FDR Tie CLV 34F1-Kelly Hill Rbld CHW 12F2-Flowery Trail Recond GIF 34F1Midline GRN 12F2 Recond 4.1 Mi Old Kettle
Rd CHW 12F4 Recond near Ctnwd Road CLV 12F4 Recond 1.6 mi KET 12F2 -Chg FDR Voltage to 13.2 kV DVP 12F2-Recond 6 miles Hwy 2
I SPG 761-Recond Small CU LIN 711-Convert to 25 kV-tie Rox751 LIB 12F3 Red W Side Lib Lk NW 12F3 tie INT 12F1 Strong Rd URD COB
12F2 Bern hill Rd Red 2 ACSR 3HT 12F1-12FS Tie at Iron Bridge BKR 12F3 Recond 1 mi-Central Premix COB 12F1 -Split FDR 3HT 12F3
Recond 2/0 Switch #980 MIL 12F2 tie to 12F3 Northwoods URD SIP General Upg WAK 12F1-12F4 Tie BEA 12F6-9CE 12F1 Havana Red 1/0 I ACSR FWT 12F4 -C&W 12FS River Xing INT 12F2 Recond 2 mile-Rutter Pkwy INT 12F2 -DEE 12Fl Improve Tie SUN 12F4 -Reconductor 2/0
@ SIA SUN 12F2 -Replace Sw 475 w/ Recloser DEE 12Fl Midine (protection req.) Crapo Removal (aka Big R) 8 miles 3HT 12FS-F2 TIE C&W
12F1-12FS 2/0 C&W 12F4-SUN 12F1 SUN 12F4-12F2 #2CU MIL 12F2-12F3 URD Northwoods AIR 12F2-SUN 12F4 URD SIA Flint Rd DEE 12Fl
Tie on Wildrose (again) NE 12F2 Tie at Kaiser MEA 12Fl-Tie at Kaiser ROS 12F2-3HT 12F7 Tie DEE 12F2-MIL 12Fl DTW East (move to sub)
Flint Road Sub SUN 12F4 replace mid line 249R CLV Area Switched Banks ORI 12Fl-ARD 12F2 FDR Tie (OH, UG) LF34F1-Mid line CLV 34F1
Midline OSB 521-Recond/ViperforCoeur Mine OLD-DxTie Recond DAL 131 Recond 1.5 mi DAL 131-Recond 1.4 mi DAL 131-Recon 0.8
mi (lakeshore) DAL 133 -Add 1-ph 3.1 miles PF 213 -Recond 1.2 mi Riverbend Pk HUE 142 -Extend 3ph 0.5 mi DAL 134-Coldwater Ck
1 Loop BLU 321 Recond 3 mi (Silver Beach) LKV 343 -Conv 6 mi to UG PVW 241-Ext 1 mi BLU 321-Recond 1.2 mi PIN 442-Recond 1 mi
OGA 611 -Recond 1.5 mi PIN 441 -Reconductor FDR Tie SPT 4521 -River Xing & Reloc at Sundowner OLD 721 -create UG loop for Ind Pk
PVW 243 -Cap Bank Riverbend Comm PF 213-Recond McGuire Road BLU 321-Rbld & UG near Tony's Rest CDA 125-Recond #6 Crapo
Dalton & 17th STM 633 -Convert 3 Laterals to UG HUE142 -Recd 1 mile on Atlas to 2/0 ACSR CKF711 Red Fir Ln conv to UG SPT4S23 -
Recd 1.8 mi at sub PIN441-Finish 2013 proj. IDR253-Church RD UG conv. Reliability SPT4S21-Reroute hvy tree area WAL542-remove
abandoned FDR BLU321-Add 3rd ph Wolflodge lat CDA 124-Recond NIC Loop HOL 1206 -Recond 3700' SLW 1358 Extend ORO 1281 TEN
1253 - 1 mi recond & regs CFD 1210 -Recond #6 CU PAL 312-Red #4ACSR to Viola MOS 515 tie to 512 CFD 1211-ext 556 trunk 2miles DRY
1209-rebuild Smi towards Silcott LOL 1359 -2-3miles of lateral rbld PDL1201 tie to DRY 1208 PDL 1203 -3ph loop, so portion TEN 1255 -
recond .75 mi at 5th & Cedar TEN 1257 - 1 mi lateral rbld ORO 1281-1 mi recond at sub WSU Steam plant -cable & conduit CFD 1211-
Regs at 1.5 miles GRV 1273-Regs at Orogrande and E City SWT 2403 -Cap bank at Lapwai WIK1279 -extend 2 ph Hwy 95 & Denver GRV
1272 tie to WIK 1278 so of hwy LMR-NLEW13-tie & riverxing DRY 1208 tie to PDL 1202 -Fair & 13th SLW 1348 tie to SLW 1358-25th &
8th TEN 1256 -mid line TEN 1257 tie to LOL 1266 ORO 1281-midline KOO 1299-midline JPE 1287-midline KAM-KOO tieline LEO 611-U/B
Date
Review Cycles
2012-2016
Template
Pmted: 9/1/2016
G:\2016\2016 ID ELEC GRC\Production R~ests\Draft\Dave\Segmert Reconructor a-id FDR Tie Pror~m_062615
Page 3 of4
Capital Program Business Case
'.WDTA'
Page4 of4
Staff_PR_ 135 Attaachment B
I
Pmted: 9/'1/2016
G:'2016\2016 IOElEC GRC\Procb:::tio Re<1,.1ests\D"81'\\Dave\Segment Reconducttir a,cl FDR Tte Prorgam._(>62615
Page 4of4