Loading...
HomeMy WebLinkAboutEnbridge 260315 - 260317 Logan Construction Construction IPUC Pipeline Safety Inspection Inspector(s): Brooks, Green Date(s): 260315-260317 Company/Owner: Enbridge Unit/OPID: 12876 Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug& Alcohol: ❑ Inspection Days: 4.5 Inspection Summary Audit consisted of IPUC inspectors Brooks and Green inspecting field installed equipment for the FL074, Franklin-Preston, Idaho inspection unit. The PHMSA IA question set, and Enbridge equipment listing were used as a guide throughout the audit to ensure all areas were completed/covered. March 15, 2026: (1.0 Standard JB) (1.0 Standard AG) Travelled to Logan, Utah. March 16,2026: (1.0 Standard JB) (1.0 Standard AG) Met with Enbridge company representatives at the Logan office for an in brief and to begin field audit and reviewed OQ records for all personnel taking part in the inspection. • 7 regulator stations were inspected for proper operation, regulator lock-up, relief device operation, cathodic protection pipe-to-soil readings, pipe-to soil interface wrap protection, station warning signs and right-of-way clearances. • 1 cathodic protection rectifier, 3 casing and carrier CP readings taken, 12 emergency/isolation valves were checked for proper operation. An exit interview was performed following the district inspection with field personnel and compliance specialist Justin Berg. Inspectors returned to Boise office upon completion of inspection. March 17,2026: (0.5 Standard Post AG) Completed audit forms: PHMSA IA question set with OQ protocol 9, IPUC Form 1, Post-Inspection Preliminary Written Findings and attached inspection documents. Discrepancies: None. Recommendations: Add vehicle protection to FC0006 birdcage per § 192.317(b) Protection from hazards. Corrective Action Required: ❑ Yes ® No Compliance Letter#: None Lead Inspector: Green Date: Reviewer: Brooks Date: 260317 Signature: / Signature: f' a6031 T IPUC Form 1 Rev. 12/08/2025