Loading...
HomeMy WebLinkAboutIntermountain Gas 260323 Gooding Construction Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 260323 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 506 California Street City/District: Gooding Contractor/Job #: Foreman: Operator Supervisor: N/A KV-W012457272 J. Baird Job Description: %" Service Line Replacement System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2026112232 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT 3/4" inch dated 11/2025 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 24" on private property OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with sand in trench SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 12 gauge through bore 5. Valve Installation OPS 703 SAT 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 97 psi for 15 minutes 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 SAT Tapped into 2"main line 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Hand dig to locate 2"main 21. Plastic Pipe OPS 307 SAT Observed 3/4"butt fusion - Joiner(s) Qualified OPS 309 Observed electrofusion saddle T - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included (506 California Street, Gooding): Safety equipment, JSA, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, boring, line locating, observed butt fusion process, electrofusion saddle T, EFV 1200 installation, tracer wire, bedding with sand in trench, successful pressure test, backfill and continuity test. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes N No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: 260323 a` O y ly Signature: Signature: IPUC Form 4 Rev.12/08/2025