Loading...
HomeMy WebLinkAboutIntermountain Gas 260319 Eagle Construction Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 260319 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 7919 Hawks Beard Lane City/District: Eagle Contractor/Job#: Foreman: Operator Supervisor: None DASCO -W012503548 J. Garcilazo Job Description: 2" Service Line System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2026113936 Total Inspection Days: 0.5 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT 2" inch dated 8/2024 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 30" deep OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Hand dig to expose service stub 21. Plastic Pipe OPS 307 SAT Observed 2"butt fission - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included(7919 Hawks Beard Lane, Eagle, ID): Safety equipment, JSA, valid dig ticket, verified operator qualifications, verified equipment calibration, line locating, correct trench depth, observed butt fusion process and verified proper rollback of completed 2"butt fusions. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: 260319 ' Signature: Signature: a604ly IPUC Form 4 Rev. 12/08/2025