Loading...
HomeMy WebLinkAboutIntermountain Gas 260318-19 Meridian Construction Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 260318-19 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 425 E Watertower St City/District: Meridian Contractor/Job#: Das-Co Foreman: Operator Supervisor: W012474469 A. Rodriguez Job Description: 2" Service Line System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2026082940 Total Inspection Days: 2.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT 2" inch dated 4/2025 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 30" deep, potholing OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with sand SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT Did not hook too main 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Hand dig to locate 4"main 21. Plastic Pipe OPS 307 SAT Observed 2"butt fusion - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included (425 E Watertower St, Meridian): Safety equipment, JSA, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, potholing, line locating, observed butt fusion process, tracer wire, bedding with sand and backfill. All observed procedures completed by field personnel were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: P rkins Date: Reviewer: Brooks Date: 260319 Signature: Signature: a60'liy jV IPUC Form 4 Rev. 12/08/2025