Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 260316-18 Boise Construction Construction
IPUC Construction Inspection Inspector(s): Gatti Date(s): 260316-18 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 7200 W Barrister Road City/District: Boise Contractor/Job#: Foreman: Operator Supervisor: V. Bermendez DASCO -W012474469 J. Maceda Job Description: 2" Service Line from 4" Main System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2026081340 Total Inspection Days: 2.5 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT 2" inch dated 4/2025 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 36" deep OPS 322 Potholing, boring under roadway 3. Bedding/Backfill OPS 308 SAT Bedding with sand SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 12 gauge throu h bore 5. Valve Installation OPS 703 SAT Supported valve prior to backfill 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 100 psi for 1 hour 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 SAT Tapped into 4"main line 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT No EFV. Curb valve installed at main 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Hand dig to locate 4"main 21. Plastic Pipe OPS 307 SAT Observed 2"butt fusion - Joiner(s) Qualified OPS 309 Observed electrofusion saddle - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included (7200 W Barrister Road, Boise): Safety equipment, JSA, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, potholing, boring, line locating, observed butt fusion process, electrofusion saddle T, curb valve installation, tracer wire, bedding with sand, successful pressure test and backfill. All observed procedures completed by field personnel were followed in accordance with IGC Operations and Maintenance Manual. Requested documentation from IGC compliance personnel regarding an irregular 2"butt fusion that was completed by the manufacture to ensure a successful pressure test and applicable butt fusion specifications were followed. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: 260318 Signature: Signature: IPUC Form 4 Rev. 12/08/2025