Intermountain Gas 260309-13 Gooding Construction Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 260309-13 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: California/Colorado/Nevada& 5-811 and City/District: Gooding Utah&4th Contractor/Job #: W/O 333102 Foreman: Operator Supervisor: J. Hunter J. Gordon Job Description: 4" & 2" Main and 3/" services System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2026081098, multiple locate tickets Total Inspection Days: 5.0 for this job. Tasks: Procedure Rating Comments 1 1. Materials—Handling, Storage, OPS 11 SAT 4" and 2" dated 07/2024, %" dated Labeling 11/2025 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 36" deep OPS 322 _ 3. Bedding/Backfill OPS 308 SAT Sand/Native Soil SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 SAT Exposed 4" steel pipe coating was OPS 402 in good condition OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 10OPSI for 2 hours 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 SAT 4" and 2" 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 1200 for all services 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 UNSAT Fire extinguisher/did not complete SF 422 JSA or wear proper PM_ IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT 21. Plastic Pipe OPS 307 SAT Observed 4", 2" & %" butt fusions - Joiner(s) Qualified OPS 309 met fit and electro fuses -Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate -Joining Procedure 22. Steel Pipe OPS 200 SAT Welded on 4" and 2" tapping tees -Welder(s) Qualified OPS 201 and transition fitting to 4" and 2" Pipe/Coating—Inspected/Repaired OPS 202 PE. - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations of IGC crew included (California/Colorado/Nevada&5-8,h and Utah&4th, Gooding, ID, Safety equipment, multiple times crews were not wearing proper PPE, had not completed JSA or correctly covered needed items, valid dig ticket, locating, verified operator qualifications, verified equipment calibration, correct trench depth, welding on transition fittings, observed/verified proper rollback of completed 4", 2" & V butt fusions, installed 200' of 4" PE pipe, 1500' of 2"pipe and 1000' of V pipe, pigging, tracer wire and bedding with sand, backfilled with native soil, compacting, boring and rock sawing. Quizzed employee on applicable ADCs for rough handling times. Twin Falls IGC leadership met with KV leadership to discuss shortcomings on wearing proper PPE and not completing JSA's correctly. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector:VPkins 7 Date: Reviewer: Brooks Date: 260313 Signature: Signature: 6 03 7 IPUC Form 4 Rev. 12/08/2025