Loading...
HomeMy WebLinkAboutAvista 2026029-13 Coeur d' Alene Construction Construction IPUC Pipeline Safety Inspection Inspector(s): Perkins/Green Date(s): February 9-13, 2026 Company/Owner: Avista Utilities Unit/OPID: 31232 Standard: ❑ Training: ❑ TIMP/DIMP: ❑ OQ: Incident: ❑ Damage Prevention: ❑ Drug&Alcohol: ❑ Inspection Days: 10.0 Inspection Summary February 9,2026: (2.0 OQ Travel) Inspector Perkins/Green traveled to Coeur d' Alene to attend OQ training at the Jack Stewart Training Center in Spokane, WA. February 10-12,2026: (6.0 OQ Training) Inspector Perkins and Inspector Green traveled to Spokane to attend Operator Qualification(OQ) training conducted by Avista crew personnel. Training activities observed included: • PE pipe joining • Hydraulic butt fusion • Manual butt fusion • Mechanical couplings • Electrofusion fittings • Bolt-on tapping tees • Line locating • Regulator station bypassing • Tapping a 2" steel line • Odorant testing • Cathodic protection testing • Wiring of test posts • Destructive testing of all plastic fusions Additional safety and emergency response training included donning fire suits and SCBA equipment, as well as practical fire-fighting techniques using fire extinguishers. Inspectors also attended a mock emergency exercise with Avista crews and local fire department personnel, followed by participation in the after-action review. Inspectors reviewed new tools and materials currently being used or tested in the field,received an overview of Avista's damage prevention program—including reporting and cost-recovery processes—and discussed new technologies under consideration. Emphasis was placed on the importance of completing all required documentation thoroughly and accurately. A complete list of attendees is available in the designated folder. IPUC Form 1 Rev.12/11/2024 IPUC Pipeline Safety Inspection February 13, 2026: (2.0 Travel) Traveled back to Boise and Completed IPUC Form 1. Corrective Action Required: ❑ Yes ® No Compliance Letter M NA Follow Up Required: ❑ Yes ® No By Date: NA Lead Inspector: Perkins Date: Reviewer: Brooks Date: 260213 Signaturea- a Signature: K-- 16O310 IPUC Form 1 Rev.12/11/2024