Loading...
HomeMy WebLinkAboutIntermountain Gas 260311 Emmett Construction Construction IPUC Construction Inspection Inspector(s): GaIR Date(s): 260311 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 2750 Soulen Drive City/District: Emmett Contractor/Job #: W012451451 Foreman: Operator Supervisor: None C. Zimmerman Job Description: 3/" Service Line System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2026093600 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT 1/" inch dated 10/2025 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 24" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with native soil SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 92 psi for 15 minutes 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 N/A 21. Plastic Pipe OPS 307 SAT Observed V butt fusion - Joiner(s) Qualified OPS 309 Squeeze off -Fusion Tools OPS 325 Mechanical fittings (con-stab - Squeezing OPS 800 coupler) - - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included(2750 Soulen Drive, Emmett, ID): Safety equipment, JSA, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, observed butt fusion process, verified proper rollback of completed 3/4"butt fusions, EFV 1200 installation, tracer wire,bedding with native soil, successful pressure test, squeeze off, mechanical fittings (con-stab coupler), backfill and continuity testing. Observed crews identify an AOC with a pre-installed leaking mechanical fitting(con-stab coupler) the crew notified their District Operations Coordinator and supervisor and replaced the mechanical fitting. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: 260311 Signature: L Signature: IPUC Form 4 Rev.12/08/2025