Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 260305 Star Construction Construction
IPUC Construction Inspection Inspector(s): Gatti, Green Date(s): 260305 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: 2903 & 2923 N Picton Ave City/District: Star Contractor/Job#: W012455804 Foreman: Operator Supervisor: None W012455801 J. Mendoza Job Description: 3/" Service Line System Type: 0 GD ❑ GT ❑ GG One-Call Ticket: 2026081951 & 2026081944 Total Inspection Days: 2.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT 3/" inch dated 11/2025 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 24" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with sand SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 100 psi for 15 minutes 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 N/A 21. Plastic Pipe OPS 307 SAT Observed 1/"butt fusion - Joiner(s) Qualified OPS 309 Squeeze off - Fusion Tools OPS 325 Mechanical Fitting(Con-Stab) - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 1 _ Additional Comments: Observations included(2903 &2923 N Picton Ave)(Split Service): Safety equipment, JSA, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, observed butt fusion process, verified proper rollback of completed 3/4" butt fusions, EFV 1200 installation, tracer wire and bedding with sand, successful pressure test, squeeze off, mechanical fitting (cons-stab) and backfill. Quizzed employee on applicable ADCs of butt fusion and squeeze off procedures. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: 260305 Signature: Signature: IPUC Form 4 Rev.12/08/2025