Loading...
HomeMy WebLinkAboutIntermountain Gas 260304 Parma Construction Construction IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 260304 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: 26497 Walker Rd City/District: Parma Contractor/Job#: W012417384 Foreman: Operator Supervisor: None S. Creasy Job Description: 4" Main Line System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2026090973 Total Inspection Days: 2.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT 4" inch dated 05/25 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT Sand on site SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 1 N/A IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pipe OPS 307 SAT Observed proper rollback of 4"butt - Joiner(s) Qualified OPS 309 fusion - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included (46497 Walker Rd, Parma) Safety equipment, JSA, valid dig ticket, line locating, verified operator qualifications, verified equipment calibration, correct trench/bore depth, verified proper rollback of completed 4"butt fusions, bedding, and backfilling. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: �603 Signature: 260304 Signature: 05 IPUC Form 4 Rev. 12/08/2025