Loading...
HomeMy WebLinkAboutIntermountain Gas 260303 Meridian Construction Construction IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 260303 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: Ustick Road between Linder and Ten Mile City/District: Meridian Contractor/Job #: W012426130 Foreman: Operator Supervisor: None K. Oakes Job Description: 6" Main Line System Type: M GD ❑ GT ❑ GG One-Call Ticket: 2026101206 Total Inspection Days: 2.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT 6" inch dated 07/2024 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation (Tracer Wire) OPS 308 N/A OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, 0 & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Potholing 21. Plastic Pipe OPS 307 SAT Observed 6"butt fusion -Joiner(s) Qualified OPS 309 Observed proper rollback of 6"butt -Fusion Tools OPS 325 fusion - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included (Ustick Road between Linder and Ten Mile) Safety equipment, JSA, valid dig ticket, line locating, potholing, verified operator qualifications, verified equipment calibration, correct trench/bore depth, observed butt fusion process, verified proper rollback of completed 6"butt fusions, observed install a weak link prior to boring. Observed employees scrap multiple sections of pipe with greater than 10%wall damage. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: ' � 260303 Signature: L �� Signature: Z60305 IPUC Form 4 Rev. 12/08/2025