Loading...
HomeMy WebLinkAboutIntermountain Gas 260302-05 Kuna Construction Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 260302-05 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: W/Hubbard &N/Linder City/District: Kuna Contractor/Job#W012450511 Foreman: Operator Supervisor: T. Galvan R Puentes-Diaz Job Description: 4" Main System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2026091060 Total Inspection Days: 4.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT 4" dated 05/2025, 2" dated 07/2025 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 42" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Sand/Native Soil SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O &M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT V away from other conduits/utilities 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher SF 422 IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT 2X Hit unmarked comm line 21. Plastic Pipe OPS 307 SAT Observed 4" & 2" butt fusions - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 1000' of 4" pipe installed - Squeezing OPS 800 4"x2" tee - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations of IGC crew included (Hubbard/Linder Rd, Kuna, ID, Contractor struck unmarked communication lines 2 times, immediately notified safety personnel, and then contacted CenturyLink to arrange for repairs. Safety equipment, valid dig ticket, locating, verified operator qualifications, verified equipment calibration, correct trench depth, observed butt fusion process, verified proper rollback of completed 4" & 2"butt fusions, tracer wire and bedding with sand and backfilled with native soil. Quizzed employee on applicable AOCs for rough handling times. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Perkins Date: Reviewer: Brooks Date: 260305 Signature: 2� Signature: IPUC Form 4 Rev. 12/08/2025