Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Avista 260211 Rathdrum Construction Construction
IPUC Construction Inspection Inspector(s): Galli,Brooks Date(s): 260211 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: Nadir Court and Eclipse Road City/District: Rathdrum Contractor/Job #: Foreman: Operator Supervisor: None 1036644709 K. Bridge Job Description: %" Service Line System Type: © GD One-Call Ticket: No dig ticket. Total Inspection Days: 2.0 Customer provided trench Tasks: Procedure# Rating Comments 1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT 2. Trenching/Boring-Depth, Clearance 3.15 SAT 48"trench depth 3. Bedding/Backfill 3.15 N/A 4. Pipe Installation(Tracer Wire) 3.13 N/A 5. Valve Installation 2.14 N/A 6. Coating Condition 2.12 N/A 7. Manuals-Field Procedures, O & M 1.4 SAT All procedures followed 8. Testing-Pressure, Duration, Type 2.12-13/3.18 N/A 9. OQ Qualifications 4.31 SAT Verified 10. Casing Seal/Installation 3.42 N/A 11. Service Line Installation 3.16 N/A 12. Tie-In/Hot Tapping 3.32 N/A 13. Meter Location/Regulator Testing 2.22 N/A 14. Equipment Calibration Verification 5.11,14,21 N/A 15. EFV Installation 3.16 N/A 16. MAOP 4.15 N/A 17. Purge 3.17 N/A 18. Safety Equipment GESH 4 SAT Fire Extinguisher and JSA 19. Abandonment 5.16 N/A 20. Line Locating 4.13 N/A 21. Plastic Pipe 3.23-25 N/A - Joiner(s) Qualified 3.34 - Squeeze - Fusion Tools - Heat Plate - Joining Procedure IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 22. Steel Pine N/A -Welder(s) Qualified 3.22 Pipe/Coating—Inspected/Repaired 2.12 - Cathodic Protection 2.32 -Non-Destructive Testing 3.12 -Welding Procedures -Removal of asbestos wrap - Exothermic Welding Additional Comments: IPUC staff traveled back to Boise on February 11, 2026. Observations included (Lone Mountain Estates, Nadir Court and Eclipse Road): Safety equipment, JSA, material verification, verified operator qualifications and correct trench depth. All observed procedures were followed in accordance with Avista procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: 260211 Signature: �/ A Signature: a6v11O IPUC Form 4 Rev. 12/08/2025