Loading...
HomeMy WebLinkAboutIntermountain Gas 260204 Middleton Construction Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 260204 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 24921 Haflinger way City/District: Middleton Contractor/Job#: W012456974 Foreman: Operator Supervisor: None J. Rodriguez Job Description: '/" Service Line System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2026052880 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT %" inch dated 11/2025 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 24" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Native soil SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 94 PSI for 15 min 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT Fire extinguisher SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pine OPS 307 SAT Observed '/" butt fusion, - Joiner(s) Qualified OPS 309 squeeze off and stab fittings - Fusion Tools OPS 325 - Squeezing OPS 800 -Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations of Das-Co crew at(24921 Haflinger Way, Middleton, ID1 Safety equipment, valid dig ticket, locating, verified operator qualifications, verified equipment calibration, correct trench depth, observed butt fusion process, stab fittings, verified proper rollback of completed 3/4"butt fusions, EFV 1200 installation, tracer wire and bedding with native soil, successful pressure test, squeeze off and shading. Quizzed employee on applicable AOCs for squeeze times. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector• erkins Date: Reviewer: Brooks Date: 260204 Signature- Signature: IPUC Form 4 Rev. 12/08/2025