Loading...
HomeMy WebLinkAboutIntermountain Gas 260203 Meridian Construction Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 260203 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 313 W Gleason St, 5895 Garbo Ave City/District: Meridian Contractor/Job#: W012445035, Foreman: Operator Supervisor: None W012455598 T. Wallace Job Description: %" Service Lines System Type: M GD ❑ GT ❑ GG One-Call Ticket: 2026051451, 2026030347 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT 3/" inch dated 05/2025 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 24" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Native soil SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation + OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 98/97 psi for 15 minutes 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT Fire extinguisher SF 422 IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT 21. Plastic Pipe OPS 307 SAT Observed V butt fusion, - Joiner(s) Qualified OPS 309 squeeze off, stab fittings and met-fit - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations of IGC crew included (313 W Gleason St, 5895 Garbo Ave, Meridian, ID, Safety equipment, valid dig ticket, locating, verified operator qualifications, verified equipment calibration, correct trench depth, observed butt fusion process, stab fittings, met-fit, verified proper rollback of completed 3/4"butt fusions, EFV 1200 installation, tracer wire and bedding with native soil, successful pressure test, squeeze off,backfill and continuity testing. Quizzed employee on applicable ADCs for squeeze times. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Perkins Date: Reviewer: Brooks Date: 260203 a' tO;o`� Signaturel* e-1-111, Signature: IPUC Form 4 Rev. 12/08/2025