BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
i : l! l,lI .: JL.' j
CASE NO. AVU.E.15-06
RESPONSES OF
CLEARWATER PAPER
CORPORATION TO THE FIRST
PRODUCTION REQUEST OF
THE COMMISSION STAFF
t8
Clearwater Paper Corporation ("Clearwater") hereby provides the following responses to
the Staff s First Production Request:
AVU-E-15-06
RESPONSES OF CLEARWATER PAPER CORPORATION TO THE FIRST
PRODUCTION REQUEST OF THE COMMISSION STAFF
PAGE 1
STAFF REQUEST NO. 1:
In September2013, Clearwater stated in DocketNo. EL13-19-000 that it owns four
generators at the Lewiston plant that utilized the black liquor by-product of paper production and
wood waste as the primary fuel for its cogeneration facilities and the four generators have
capability of generating approximately 109 MW of electric power. Clearwater Petition at 3. In
the Self Re-Certifications (Form 556) submitted on 912312013, the following maximum gross
power production is shown for the four qualifying facilities:
QF83-142 9.2 MW
QF83-143 28.8 MW
QF83-144 10.0 MW
QF92-64 43.4 MW
Total 91.4 MW
Page 19 of each of the self certifications lists the capacity of each generator as follows:
QF83-142 9.2 MW
QF83-143 28.8 MW
QF83-144 r0.0 MW
QF92-64 63.6 MW
Total I11.6 MW
The Application in this case states that the Clearwater Facility has a generation capacity
of approximately 132.2 MW (Application atp.2).
AVU-E-15-06
RESPONSES OF CLEARWATER PAPER CORPORATION TO THE FIRST
PRODUCTION REQUEST OF THE COMMISSION STAFF
PAGE 2
Please clarify the generation capacity ofeach generating unit and describe any changes
between September 2013 and the present that would result in the increased generation capacity to
132.2}i4W.
CLEARWATER'S RESPONSE TO STAFT REQUEST NO. I
There have been no increases in capacity since 2013. The generation capacity (MW) of
each generating unity is as stated in the FERC frlings atparagraph 19, as referenced above and
set forth below:
QF83-142 (refened to as TG 2) - 9.2MW
QF83-143 (referred to as TG 3) - 28.8 MW
QF83-144 (referred to as TG 1) - 10.0 MW
OF92-64 (referred to as TG 4) - 63.6 MW
Total lll.6Mw
The generators are cumulatively rated at 132.2 MVA, which is different from kW or MW
nameplate capacity. Converting 132.2MYAto a MW figure yields the most accurate figure of
I11.6 MW, which explains the referenced discrepancy in the Petition in this case (AVU-E-l5-
06). The underlying Electric Service Agreement approved in AVU-E-I3-02 correctly specifies
the capacity as 132.2 MVA in the recitals and the statement in the Petition in this case (AVU-E-
l5-06) misplaced o'megawatts" for MVA as specified in the Agreement.
As to the "maximum gross power production" set forth in paragraph 7a of the FERC Self
Re-Certifications (Form 556) submitted on 912312013, this production request notes different
figures only as to the Form 556 for QF92-64. That Form 556 provides in paragraphTa that the
maximum gross power production for QF92-64 is 43,400 kW (43.4 MW) and further provides
AVU-E-I5-06
RESPONSES OF CLEARWATER PAPER CORPORATION TO THE FIRST
PRODUCTION REQUEST OF THE COMMISSION STAFF
PAGE 3
the capacity in paragraph 19 as 63.6 MW. The basis for this difference is explained on the Form
556 and demonstrated in the mass-heat balance diagram filed at FERC with the Form 556. As
noted in paragraph 19 of the FERC Form 556, Clearwater's four Lewiston QFs and the steam
production boilers are operated as an integrated whole. Yet the QFs certifications were filed as
four separate QFs, instead of one single QF with four generators. Clearwater understands
FERC's request for each individual QF's o'maximum gross power production" in item 7a to
constitute a request for the total amount of electric energy that the individual QF can produce.
Thus, the figure in item 7a(43.4 MW) reflects Clearwater's best estimate of the total amount of
electric energy that could be produced by that individual generator operating within the entire
system. This level of production is reflected in detail on the mass-heat diagram for QF92-64,
which also indicates that the output of that QF generator is "43.4 mw."
In accordance with Rule of Procedure 228, this response was prepared by Gregory M. Adams
and Marv Lewallen. Marv Lewallen is the person who would be able to answer questions about
or sponsor factual matters in the answer.
AVU-E-15-06
RESPONSES OF CLEARWATER PAPER CORPORATION TO THE FIRST
PRODUCTION REQUEST OF THE COMMISSION STAFF
PAGE 4
STAFF RE,QUEST NO. 2:
Please list the heat rate of each of Clearwater's four generation units.
CLEARWATER'S RESPONSE TO STAFF REQUEST NO.2:
Clearwater assumes that this request seeks the heat rates used for purposes of completing
the Self Re-Certifications (Form 556) submitted on 912312013 for each of the four generating
units. To complete the Self Re-Certifications (Form 556) submitted on 912312013 for each of the
four generating units, Clearwater assumed that Turbine Generator No.l (QF83-144) and No.2
(QF83-142) were operating with the system, whereas currently those generators are back-ups
which are kept out of service. Without assuming these generators were in operation, it would not
have been possible to generate accurate estimated figures for each individual unit operating as
part of the integrated system, as required to the complete Form 556s. In the steam model used to
calculate the output from each generator, Clearwater limited the generation from any one unit to
no more than its maximum rating. Based on those assumptions, Clearwater used a heat rate of a
constant 3,550 btulkwh for extracted steam and 13,500 btu/kwh for electricity produced across
the condensing unit for each generator.
To the extent this request seeks heat rate figures based on different assumptions or
operational conditions, Clearwater has not conducted that analysis.
In accordance with Rule of Procedure 228,this response was prepared by Gregory M. Adams
and Marv Lewallen. Marv Lewallen is the person who would be able to answer questions about
or sponsor factual matters in the answer.
AVU-E-15-06
RESPONSES OF CLEARWATER PAPER CORPORATION TO THE FIRST
PRODUCTION REQUEST OF THE COMMISSION STAFF
PAGE 5
STAFF REQUEST NO. 3:
Please describe the circumstances under which Clearwater expects to generate
Incremental Energy. Please be as specific as possible and give examples if necessary.
CLEARWATER'S RESPONSE TO STAFF REQUEST NO.3:
Without limiting the circumstances where both parties may be able to benefit from sale
for Incremental Energy, Clearwater anticipates it may agree to generate Incremental Energy if
the fuel prices (additional biomass product or natural gas) for Clearwater's generation ever
decreased to a level that economically justified increasing generation levels to make sale of
lncremental Energy at the price offered by Avista during such times. Another example where
these circumstances may exist are if market prices are extremely high, during which time Avista
could request Incremental Energy and Clearwater could increase generation and provide valuable
output to Avista.
In accordance with Rule of Procedure 228, this response was prepared by Gregory M. Adams
and Marv Lewallen. Marv Lewallen is the person who would be able to answer questions about
or sponsor factual matters in the answer.
AVU-E-15-06
RESPONSES OF CLEARWATER PAPER CORPORATION TO THE FIRST
PRODUCTION REQUEST OF THE COMMISSION STAFF
PAGE 6
STAFF REQUEST NO.4:
Please provide data showing the frequency and duration of generation outages at
Clearwater since the inception of the current Agreement in June 2013.
CLEARWATER'S RESPONSE TO STAFF REQUEST NO. 4:
Please see Attachment to Clearwater Response to Staff No. 4, which includes a summary
page, as well as the individual printouts for each of the outages since June 2013 for the two
turbine generators that Clearwater has operated during this timeframe, Turbine Generator No. 3
and No. 4. Turbine Generator No. I and No. 2 have not run during this time period.
In accordance with Rule of Procedure 228,this response was prepared by Gregory M. Adams
and Marv Lewallen. Marv Lewallen is the person who would be able to answer questions about
or sponsor factual maffers in the answer.
DATED: June 15, 2015.
RICHARDSON ADAMS, PLLC
AVU-E-15-06
RESPONSES OF CLEARWATER PAPER CORPORATION TO THE FIRST
PRODUCTION REQUEST OF THE COMMISSION STAFF
PAGE 7
Turbine Generator Outases for 1/1/2013 thru 6/1/2015
lFiTG-l
Start End
#3 TG
Hours
#3 TG
Min
#3 TG
Sec
1/U2013 5am
LIL/20L4 5am
UU2o75 5am
3lLl2lts 5am
4lL/2O75 5am
5h/2075 5am
tlLl2oL4
Ll7/20Ls
2ltl201s
4luzOLs
sl1./207s
6lLl2OLs
5am
5am
5am
5am
5am
5am
1328
309
8
232
88
6
43
27
39
27
36
4'1.
20
t7
35
L
0
10
Total #3 TG Outages
3TG Outages Prior to June 2013
412312013 6:46:03am 4123/20L5 1:09:43pm
7971,
6
77201
23
Total#3 TG Outages During Agreement Period 1965 t78 37
FAE-I
Start End
#4 TG
Hours
#4 TG
Min
#4 TG
Sec
UL|2O13 5am
Ll7/2oL4 5am
3lLl2o7s 5am
4/76120L5 6:04:31pm
5am
5am
5am
10:56:21pm
t/1.12014
LIL/201s
4/7/2oLs
4/761201s
35
9t7
324
7
6
41
29
2
43
46
40
27
Total #4 TG Outages 7277
4TG Outages Prior to June 2013
2lL2l2O13 5:30:42am 211212073 7:42:59am
Total #4 TG Outages During Agreement Period 1276 56 133
t712
Attachment to Clearwater Response to IPUC Staff Request 4
AVU-E-15-06
Page I of 12
Ahrlm Causes Pareto for
PI.JI2834.PV . 3-8A 3 GEN
i319
Elapsed Time
From: Llll20l3 5i00:00 AM To Lltl20L4 5:00:00 AM
Comment
13 6:45:03
Z/tsl20L3 5:15:43 Alvl
8ltl20t3 5:00:00 AM
9ltl2oL3 5:00:00 AM
1:09:43 PM MalnEnance
8lV20l3 5:00:00 fitt4
9lU20L3 5:00:fi) AM
916120L37:28:57 ?M
hydraullc oll, checked for leaks ln
the oil cooler, and moved the
emergEncy Sp from the furblne
room panel to above the panel in
Ere ontsol room.
Sdteduled Rebuild
Schedukd Rebuild - occurs e\rery
6 years
Scheduled Rebuild - ocrurs every
5 years
Total Duration
L6,22;44;t7
31.00:00:00
5.74:28:57
129il36:54
L2l29lZ0L3 7:32:05 fr4 LZFABOL3 4:33:@ PM
of steam header conbol when the
mlll alr compressors shut down.
3'liG tripped when the speed 21:fi):55
lndlcating modde failed.
Total Duration 11:36:56
Urnlng gear during a swap b the
south oil cooler. The coolers
were swapped because the north
oil cooler was leaking.
Total Durution O1:26r15
ReportTotal 1328:{il:20
stuck open and caused a furblne
Pareto: hinted on tlL5l20L4 Page I of 1
Attachment to Clearwater Response to IPUC StaffRequest 4
AVU-E-15-06
Page? of 12
Alarm Causes Pareto for
PI.JI2834.PV - 3-8A 3 GEN
3fb
Elapsed Time
From: LlLl20L4 5:00:00 AM To LlLlz0LS 5:00:00 AM
Comment
5lU20Lc 5:ffi:00 AM 618120L410:35:40 AIvl
4 5:24:59 AM
3126120L412:18:40 PM 3126120L1 1:13:55 PM
down during #4 Power Boiler's
annual outage for maintenance
work and lns,talling a new
hydrogen cabinet
We took #3 Turbine Generator
down during #4 Power Bolle/s
annual outage for maintenance
work and installing a new
hydrogen cablnet,
ToEl DuraUon
to an EHC fluld pressure
bansmitbr failure.
Total Duration
was down to
Shlmming adjustsnents were
made to reduce vibraUons on a
turblne bearing.
#3 Turblne generator was down
fur vibration analysis.
Tohl Dur*lon
due to lack of steam from a 5RB
trip.
Total Duration
RepoftTotal
7.05:35:40
285:57:35
13:33:30
00:55:15
05:2il00
04:29:06
3O9:21:11
Pareto: Prlnted on ll3l20t5 Page 1 of I
Attachment to Clearwater Response to IPUC StaffRequest 4
AVU-E-15-06
Page 3 of 12
jI6'
Alarm Causes Pareto for
PI.JI2834.PV . 3.8A 3 GEN
From: LlLl20L5 5:00:00 AM To 2lLl20LS 5:00:00 AM
Elapsed Time
open causing a slgnal loss of
thrust bearing position to the
conbol $Ftem.
Total DuraHon
RepoftTotal
O8:39:35
O8r39:35
Pareto: Prlnted on 212120L5 Page 1 of 1
Attachment to Clearwater Response to IPUC StaffRequest 4
AVU-E-15-06
Page 4 of 12
2<e-
Alarm Causes Pareto for
PI.JI2834.PV . 3.8A 3 GEN
From: 3lLl20LS 5:00:00 AM To 4lLl20L5 5:00:00 AM
Elapsed Time
5 11:55:48 PM #3 Turbine was down for a
wide maintenance oubge,
Total Duration
Report Total
Page 1 of 1
Attachment to Clearwater Response to IPUC StaffRequest 4
AVU-E-15-06
Page 5 of 12
Alarm Causes Pareto for
PI.JI2834.PV - 3-8A 3 GEN
From: 4lLl20LS 5:00:00 AM To 5lLl20LS 5:00:00 AM
3T6
Elapsed Time
411712075 9:11:43 PM #3 Turblne was
to 1250# steam supply while #4
Power was down to repalr a tube
lealc
Total Duration
ReportTotal
Pareto: Printed on 5lLl20l5 Page 1 of 1
Attachment to Clearwater Response to IPUC StaffRequest 4
AVU-E-t5-06
Page 6 of 12
Alarm Causes Pareto for
PI.JI2834.PV . 3-8A 3 GEN
From: 5lLl20L5 5:00:00 AM To 6lll20t5 5:00:00 AM
'7 1V
Elapsed Time
#3 Turbine was down as a
ofsteam load when #5 Recovery
tripped.
Total Duration
RepoftTotal O6:41:10
Pareto: Printed on 6lU20l5 Page 1 of 1
Attachment to Clearwater Response to IPUC Stpff Request 4
AVU-E-15-06
PageT of12
Alarm Causes Pareto for
PI.JI2851.PV . 4-98 4TGMW
.{( (,
Elapsed Time
From: LlLl20L3 5:00:00 AM To LlLl20L4 5:00:00 AM
End Comment
91L7120L311:55:19 PM
9122120t3 8:34:45 AM
illu20t3 LZi27i36PM
8119120t312:01:40 AM
81L9120t31:48:43 AM
8lt9l20t3 2:49:46 AM
8ll9l20l3 4:20:22 AM
9l3l2ol3 3:00:55 AM
1:54:15 AM Down for
9l22lz0l3 LL:4L:24 AM
21t2120137:42:59 ftM.
7ltLl20t3 1r35:48 PM
8lL9l20t3 1:16:19 AM
811912013 2:04:00 AM
8119120133:22:25 AM
8ll9l20L3 5:20:13 AM
9l3l2oL3 3:40:08 AM
work during the mill outage.
Took the turbine down for
scheduled repairs during the mill
outage. Started the turbine up
without completing repairs due to
low steam demand,
Total Duration
in a breaker
for a welding oudet. The circuit
had a ground and tripped the sub
supplying power for the 5
Recovery control system.
The loss of power resulted in a
trip on #5 Recovery and caused
the steam headers to swing which
in turn tripped #4 Recovery.
Steam supply was limited due to
the loss of both boilers which
required operations to take #4
Turbine Generator down.
Loss of vacuum on 4 Turbine
Generator caused it to trip.
Discovered that steam was shut
off going to one of the ejectors.
Caused by steam header swings
after a #4 Power Boiler trip,
Caused by steam header swlngs
after a #4 Power Boiler trip,
C-aused by steam header swings
after a #4 Power Boiler hip.
Caused by steam header swings
after a #4 Power Boiler hip.
4TG tripped when the assistant
operator shut down a lube oil
pump for the generator. The
assistant mistook 4TG and 3TG
lube oil pumps during tests to
refurn 3TG to service.
Total Duration
29:04:35
01l.12l.17
01:08:12
01:14:39
00:15:17
00:32:39
00:59:51
00:39:13
O6:02:08
Pareto: Printed on UL5|20L4
Attachment to Clearwater Response to
-Tffi
IPUC Staff Request 4
AVU-E-15-06
Page 8 of 12
Start End Comment
qIa'
Elapsed Time
RepoftTotal 35:05:43
Pareto; Printed oi lll5lz0l4 Page 2 of 2
Attachment to Clearwater Response to IPUC StaffRequest 4
AVU-E-15-06
Page 9 of l2
Alarm Causes Pareto for
PI.JI2851.PV - TG4 G4 MW (GEMS)
From: LILPAM 5:00:00 AM To LlLlz0LS 5:00:00 AM
Comment
{b
Elapsed Tlme
LtlLIzOL4 5:00:00 AM
LZlLl20L4 5:00:00 AM LZlLlzlL47:4tz42PM Scfi eduled maintenance outage
Total Duration
L2l9l20l4 7:21:58 PM
lAfllzol411:04:58 PM
lUt0l20l4 8:51:04 PM
t2ll2l20l4 8:41:57 PM
4TG's exciter after the outage.
Additional downtime occured to
take the firrbine down and dean
the orcihr.
Welds in the high pressure steam
lines on #4 Turbine began to fail
after startup. The turbine was
taken offiine for repairs.
#4 Turbine tripped off llne
following a #5 Recovery trip. The
turbine was left down for an
extended time in order to repair a
steam leak.
Total Duration
1.01:29:06
21:36:59
l77t59t3l
05:00:33
9l7t4l:46
Total Duration
RepotTotal
offline due to a vibraffon probe
instrumentation problem on #3
bearing.
Pareto: Pfrnted on ULZlz0ts Page 1 of 1
Attachment to Clearwater Response to IPUC StaffRequest 4
AVU-E-15-06
Page 10 of 12
PI.Jr2851 TG4 G4 MW (GEMS)
From: 3lLl20L5 5:00:00 AM To 4ltl20t5 5:00:00 AM
Comment
Alarm Causes Pareto for
4iu
Elapsed TIme
31212:0L511132:32 PM 3ll0l20t51t:06:42 AM
3lL7l20L5 L2:L3:27 PM
the steam system for the ouEge.
#4 Turbine was doun for a milF
wide maintenance outage.
Total Duration
#4 Turblne was down to
the 600# non-refurn valrre.
#4 Turbine was down to repair
he 600# non-rehtrn valve.
Total Duration
Report Total
7.11:34:10
180:17:01
324t29t4O
Pareto: Printed on 412120L5 Page 1 of 1
Attachment to Clearwater Response to IPUC StaffRequest 4
AVU-E-15-06
Page ll of12
'/ l,'+\"
Alarm Causes Pareto for
Pr.Jr28s1,PV - TG4 G4 MW (GEMS)
From: 4lL6l20t5 6:04:31 PM To 4lL6l20L5 10:56:21 PM
Elapsed Time
RepoftTotal 01:02:21
Pareto: Printed on 5l Ll20l5 Page 1 of 1
Attachment to Clearwater Response to IPUC Staff Request 4
AVU-E-15-06
Page 12 of 12