Loading...
HomeMy WebLinkAboutIntermountain Gas 260108 Boise Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 260108 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 1628 S Londoner Ave City/District: Boise Contractor/Job#: W012421606 Foreman: Operator Supervisor: None A. Rodriguez Job Description: '/" Service Line System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2025502375 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT %" inch dated 11/2025 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 24" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with native soil SF 418 _ 4. Pipe Installation (Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 12 gauge bored 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 96 psi for 15 min 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A Did not observe 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT Cleaning purge 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Potholing 21. Plastic Pipe OPS 307 SAT Observed completed butt fusion - Joiner(s) Qualified OPS 309 Squeeze off - Fusion Tools OPS 325 Continental Stab Fitting - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included(1628 S Londoner Ave, Boise, ID): Safety equipment, JSA, valid dig ticket, verified operator qualifications,potholing, horizontal boring and pullback, verified equipment calibration, correct trench depth, verified proper rollback of completed 3/4"butt fusions, stab fittings, tracer wire, successful pressure test, squeeze off, cleaning purge, bedding with native soil and backfill. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: 260108 Signature: Signature. "°1 Z'd IPUC Form 4 Rev.12/08/2025