Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 260129-30 Jerome - Twin Falls Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 260129-30 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 1325 1811 Ave, 1965 Blue Lakes Blvd City/District: Jerome-Twin Falls Contractor/Job#: W012454868, Foreman: Operator Supervisor: None W012454856 L. Hawkins Job Description: 3/" Service Line/2" Service Line Relo System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2026042394,2026050455 Total Inspection Days: 2.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT %" inch dated 07/2025,2" Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 30" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Native soil SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation OPS 703 ' N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 96 for 15 min/98 psi for 30 min 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 4 Install/2" relocation 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT Fire extinguisher SF 422 IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT 21. Plastic Pipe OPS 307 SAT Observed %" butt fusion - Joiner(s) Qualified OPS 309 Squeeze off, electrofusion. 2" butt - Fusion Tools OPS 325 fusion, met-fit. - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included (1325 18th Ave, Jerome, ID): Safety equipment, valid dig ticket, locating, verified operator qualifications, verified equipment calibration, correct trench depth, observed butt fusion process, stab fittings, electrofusion, verified proper rollback of completed 3/4"butt fusions, EFV 1200 installation, tracer wire and bedding with native soil, successful pressure test, squeeze off, backfill and continuity testing. Quizzed employee on applicable AOCs for fusion equipment inspections and rough handling times. All observed procedures were followed in accordance with IGC procedures. 29-30 January. Observations included (1965 Blue Lakes Blvd, Twin Falls, ID,): Relocation of 2"meter set and 2" service line approximately 3 feet. Safety equipment, valid dig ticket, locating, verified operator qualifications, verified equipment calibration, correct trench depth, observed butt fusion process, met-fit, and bedding with native soil, squeeze off. Quizzed employee on applicable AOCs for fusion equipment inspections and rough handling times. All observed procedures were followed in accordance with IGC procedures. 30 January. Observations included(1965 Blue Lakes Blvd, Twin Falls, ID) Safety equipment, verified operator qualifications, pressure test, butt fusion, met-fit, bedding with sand and native soil, and backfill. Traveled back to Boise and completed paperwork and forms. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Perkins Date: Reviewer: Brooks Date. 260130 Signature: Signature: 01 L0 0-? IPUC Form 4 Rev. 12/08/2025