Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 260128 Idaho Falls Construction
IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 260128 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: Fairway Estates City/District: Idaho Falls Contractor/Job#: W012347658 Foreman: Operator Supervisor: None K. Cornelsen Job Description: 4" to 2" Main Line System Type: M GD ❑ GT ❑ GG One-Call Ticket: 2026030272 Total Inspection Days: 2.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT 4" inch dated 05/25, 02/25, 06/24 Labeling 2" inch dated 04/2025 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 48" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with sand SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Ray. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 N/A 21. Plastic Pipe OPS 307 SAT Observed 4" butt fusion - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pig e OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included(Fairway Estates, Idaho Falls, ID): Safety equipment, JSA, valid dig ticket, verified operator qualifications, verified equipment calibration,material verification,pipe stringing, correct trench depth, observed butt fusion process, verified proper rollback of completed 4"butt fusion, tracer wire and bedding with sand. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Gath Date: Reviewer: Brooks Date: 260128 Signature: / Signature: IPUC Form 4 Rev.12/08/2025