Loading...
HomeMy WebLinkAboutIntermountain Gas 260121 Boise Construction IPUC Construction Inspection Inspector(s): Perkins, Green Date(s): 260121 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Dasco Address: 430 N 1 lch St City/District: Boise Contractor/Job: 425-57FS-113 Foreman: Operator Supervisor: J. Jaeger-Bauder J. Maceda Job Description: 2" Service Line pressure test System Type: 0 GD ❑ GT ❑ GG One-Call Ticket: #: 2026032814 Total Inspection Days: 2.0 Tasks: Procedure Rating l Comments 1. Materials—Handling, Storage, OPS 11 N/A Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 24" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Observed bedding with sand SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 100 psi 30 min 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 10000 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Hand dig to locate main. 21. Plastic Pipe OPS 307 SAT Metfit joints - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 -Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 SAT - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included (430 N 1 lth St, Boise, ID) DASCO: Safety equipment, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, successful pressure test, metfit installation, tracer wire, removing wax wrap to shut valve, installing new wax wrap and bedding with sand. IGC: Observations included meter installation and testing. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes N No Compliance Letter#: NA Lead Inspector: Perkins Date: Reviewer: Brooks Date: 260121 Signature: ?� Signature: -,,60�,a3 IPUC Form 4 Rev.12/08/2025