Loading...
HomeMy WebLinkAboutIntermountain Gas 260113-15 Eagle Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 260113-15 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: Floating Feather/Linder City/District: Eagle Contractor/Job#: W012422771 Foreman: Operator Supervisor: N/A K. Oakes Job Description: 6" Main Installation System Type: 0 GD ❑ GT ❑ GG One-Call Ticket: 2025520542 Total Inspection Days: 3 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT Sand 12" bed and 12" cover SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Electrofusion machine 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT JSA& Extinguishers SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pine OPS 307 SAT 150' bore pullback, electrofusion - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Floating Feather/Linder, Eagle ID Observations included: safety equipment, JSA, valid dig ticket, locates, verified operator qualifications, correct trench depth, bedding, backfill, bore pullback and electrofusion. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes No Compliance Letter#: NA Lead Inspector: P kins Date: Reviewer:PaoK5 Date: 260115 Signature: Signature: U 01 0 IPUC Form 4 Rev. 12/08/2025