Loading...
HomeMy WebLinkAboutIntermountain Gas 260112 MT Home Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 260112 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 923, 951 NE Trailridge St City/District: MT Home Contractor/Job#: W012182927, Foreman: Operator Supervisor: N/A W012179476 Tuchlinski Job Description: 3/" PE Services Installation System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2025510253, 2025510254 Total Inspection Days: 1 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT 12" sand SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 96 PSIG—Pneumatic, air as media 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 1 IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pipe OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: 923, 951 NE Trailridge St, MT Home, ID Observations included: safety equipment, JSA, valid dig ticket, locates, verified operator qualifications, equipment calibration, correct trench depth, butt fusions, stab fittings and met-fit, EFV installation, bedding, pressure test, squeeze off,purge, and backfill. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Perkins Date: Reviewer: Date: 260112 Signature: Signature: 1601�'b i IPUC Form 4 Rev. 12/08/2025