Loading...
HomeMy WebLinkAboutIntermountain Gas 260107 Boise Construction IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 260107 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: 2305 Goodman City/District: Boise Contractor/Job#: W012429506 Foreman: Operator Supervisor: B. Swaner G. Gomez Job Description: 2" Main Line Replacement System Type: M GD ❑ GT ❑ GG One-Call Ticket: 2025520056 Total Inspection Days: 2.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2" inch dated 04/2023 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 8 feet d OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation(Tracer Wire) OPS 308 N/A OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT All observed procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 N/A 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev, 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Hand dig to locate main 21. Plastic Pipe OPS 307 N/A - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included(2305 Goodman, Boise, ID): Safety equipment,valid dig ticket, line locating, verified operator qualifications and correct trench depth. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: 260107 Signature: ' Signature: IPUC Form 4 Rev. 12/08/2025