Intermountain Gas 260106 Caldwell Construction
IPUC Construction Inspection Inspector(s): Brooks Date(s): 260106 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: 14803 Wing Spread Dr, Passero Ridge City/District: Caldwell Subdivision Lot 22-18 Contractor/Job#: W012351873 Foreman: Operator Supervisor: Monty Mendoza Job Description: 3/" PE Service Installation System Type: N GD ❑ GT ❑ GG One-Call Ticket: 2025531095 Total Inspection Days: 1 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 100 PSIG—Pneumatic, air as media 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pipe OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: 1088 N Gracie Ave, Eagle, ID Observations included: safety equipment, JSA, valid dig ticket, locates, verified operator qualifications, equipment calibration, correct trench depth, butt fusions, EFV installation,bedding with sand, pressure test, squeeze off, purge, and backfill. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Brooks Date: Reviewer: Date: 260106 Signature: Signature: IPUC Form 4 Rev.12/08/2025