HomeMy WebLinkAboutIntermountain Gas 260115 Boise Construction IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 260115 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: 6955, 6949, 6937, 6923 S. Spindlebush Ave City/District: Boise Contractor/Job: W012447387, Foreman: Operator Supervisor: None W012447382, W012447719 C. Dahl Job Description: %" Service Line System Type: ® GD ❑ GT ❑ GG One-Call Ticket: #: 2025520149, 2025520150, Total Inspection Days: 2.0 2025520151, 2025520153 Tasks: Procedure Rating Comments 1. Materials —Handling, Storage, OPS 11 SAT %" inch dated 5/25 Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 24" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Observed bedding with sand SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A Did not observe 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire extinguisher SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Hand dig to locate main. 21. Plastic Pipe OPS 307 SAT Observed %" butt fusion - Joiner(s) Qualified OPS 309 Continental Stab joints - Fusion Tools OPS 325 Metfit joints - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included (6955 & 6949 S. Spindlebush Ave, Boise, ID) (Split Service): Safety equipment, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, verified proper rollback of completed 3/4"butt fusions, observed butt fusion process, observed metfit and continental stab process, EFV 1200 installation, tracer wire and bedding with sand. Observations included (6937 & 6923 S. Spindlebush Ave, Boise, ID) (Double Manifold): Safety equipment, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, verified proper rollback of completed 3/4"butt fusions, observed butt fusion process, observed metfit and continental stab process and EFV 1200 installation. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: 260115 aL 60�03 Signature: � � : '. Signature: #L_ IPUC Form 4 Rev.12/08/2025