Loading...
HomeMy WebLinkAboutIntermountain Gas 250908 IPUC Form 1 - IGC Compressor Stations IPUC Pipeline Safety Inspection Inspector(s): Galli,Brooks, Perkins, Green Date(s): 250908, 18, 22 Company/Owner: Intermountain Gas Company Unit/OPID: 08160 (IGC) Standard: ❑ Training: ❑ TIMP/DIMP: ® OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug&Alcohol: ❑ Inspection Days: 3.5 Inspection Summary September 8, 2025: (0.5 TIMP) IPUC Inspector Galli conducted an audit of Intermountain Gas Company's Compressor Stations. IGC OPS 101, OPS 106, and the Jerome and Shoshone Station Manuals were reviewed and compared to the PHMSA Inspector Assistant(IA) question set. September 18, 2025: (2.0 TIMP) (0.5 Galli) (0.5 Perkins) (0.5 Brooks) (0.5 Green) Galli, Perkins, Brooks and Green met with IGC personnel virtually and in-person at the Twin Falls, Idaho field office to review records and begin the observation portion of the inspection. September 18, 2025: (0.5 TIMP Travel) (0.5 Galli) Galli traveled back to Boise. September 22, 2025: (0.5 TIMP Post) A complete list of attendees can be found in the IA inspection. Completed IPUC Form 1 and the Post- Inspection Written Preliminary Findings were sent to Colby Lundstrom, Manager of Operations Compliance. Discrepancies: 1. Records were not maintained for 5 years per the Jerome Compressor Station Manual and 192.709(c). IGC was only able to furnish records for CY2023 and CY2024. Corrective Action Required: ® Yes ❑ No Compliance Letter#: I202513 Follow Up Required: ® Yes ❑ No By Date: November 6, 2025 Lead Inspector: Galli Date: Reviewer: Brooks Date: ,�� 250922 Signature: �� `j! Signature: . a6o1�.0 IPUC Form 1 Rev. 12/11/2024